 Street and Sidewalk Defect Reporting
 

Residents are encouraged to call the DPW Street and Sidewalk Defect Reporting line at (617) 349-4854 or e-mail theworks@cambridgema.gov to report any concerns that they have. Please describe the location as detailed as possible (including the address) and note the date and time of call.

The Street Maintenance Division will review and inspect the location, usually within 2 working days. In the case of a sigificant sidewalk displacement, crews will mark out the area with fluorescent paint or cones. Temporary and permanent repairs will be scheduled based on the system described in the City's Sidewalk Inspection and Minor Repair Program.

   
 Curbcut (Driveway Cut) Information
 

In order to apply for a curbcut (driveway cut), the property owner must first fill out an Application for Driveway Cuts and Openings, available online at http://www.cambridgema.gov/~Inspect/form10.pdf or at the Inspectional Services Department at 831 Massachusetts Ave or the DPW at 147 Hampshire St.

Once the application is properly filled out it is then:

  1. Submitted back to Inspectional Services. The application is then
  2. Reviewed by Inspectional Services and, if approved, it is then
  3. Sent on to Traffic, Parking and Transportation, the Historical Commission and the Cambridge DPW. Once approved by these City departments, the application
  4. Goes before the City Council for final approval. Once the City Council approves the curbcut, the application is then
  5. Sent back to the DPW for schedule of construction. The full cost of the curbcut must be paid to Public Works before the construction can begin.

A brochure about the curbcut application process from the Community Development Department is also available online at http://www.cambridgema.gov/cdd/ed/pubs/sbys/sbs_curbcut_1998.pdf.

 
 

 Planned Street and Sidewalk Improvements, 2008-2009*

Street Name
Perimeters
Description
Huron Ave Cushing to Aberdeen Sidewalk/ Roadway
Upland Road Mass to Raymond Sidewalk/ Roadway
Rindge Ave Rice to Alewife Brook Parkway Partial Sidewalk/ Roadway
Mount Auburn Story to Gibson Partial Sidewalk/ Roadway
Grozier Road at Fresh Pond Parkway intersection Sidewalk
St Saveur Court Cushing to May Roadway
Brattle Street Church to Mason Roadway
Linnaean Street Garden to Raymond Roadway
Clarendon Street Somerville line to Mass Ave Roadway
Fulkerson Street Bent to Binney Some sidewalk/ Roadway
Walden Street Richdale to Sherman Roadway
Rogers Street First to Lopez Sidewalk
Sellers Street Mass to Green Sidewalk
Mass Ave Churchill to Alewife Brook Parkway Sidewalk
Sixth Street Cambridge to Gore, Charles to Bent Sidewalk
Putnam Avenue River to Magazine Roadway
William Street Magazine to Pearl Sidewalk/ Roadway
Green Street Western to Putnam Sidewalk/ Roadway
Essex Street Bishop Allen to Harvard Sidewalk
Brookline Street Henry to Pacific Sidewalk/ Roadway
Blanchard Road Grove to Concord Sidewalk/ Roadway

The City's 5 Year Street and Sidewalk Plan provides background about the prioritization of street and sidewalk repairs and lists additional projects identified for funding through 2012.

 
*Updated 08/15/2008. This list does not include associated utility improvements (ie gas, water, sewer) that may be done in advance of surface improvements. All projects include reconstruction of pedestrian ramps. Location, scope, and schedule of all projects subject to revision.
 