|
A permit shall be obtained from the Fire Department prior to using a torch or other heat producing device for the removal of paint or the application or removal of roofing material from any building or structure.
527CMR 10:24
Permits must be applied for in person at Fire Headquarters 491 Broadway second floor
M-F 8am-10am
-
A fire extinguisher or water hose connected to an adequate water supply must be provided
-
The person doing the work shall remain on the premisis for one hour after each use of the heat producing device.
|