pdf
|
2019 Site Monitoring Report
The Cambridge Watershed Site Monitoring Program Report is a summary of the site monitoring, outreach, and review efforts of the Cambridge Water Department (CWD)’s Watershed Management Division.
|
|
|
pdf
|
2019 Fresh Pond Reservation Class B Water Quality Report
This report presents the 2019 water quality monitoring results for three ponds on the Fresh Pond Reservation: Little Fresh Pond, Black’s Nook, and North Pond.
|
|
|
pdf
|
2019 Benthic Macroinvertebrate Report
In 2019, CWD analyzed benthic macroinvertebrates in four tributaries in the Cambridge surface water supply watershed. These results are presented in the 2019 Benthic Macroinvertebrate Report.
|
|
|
pdf
|
2019 Algae Monitoring Report
This report presents the 2019 results from CWD's Algae Monitoring Program, part of an on-going study to assess source water quality in Cambridge reservoirs.
|
|
|
pdf
|
2018 Source Water Quality Report
This report presents the 2018 results of the City of Cambridge Water Department (CWD)’s Source Water
Quality Monitoring Program, an ongoing study to assess source water quality in Cambridge reservoirs and
associated tributaries.
|
|
|
pdf
|
2018 Site Monitoring Report
Highlights include: Completion of the Drainage and Community Gardens project at Fresh Pond Reservation; drainage improvements along the Hobbs Brook Reservoir dam crest (Winter St) in Waltham; proposed, completed, and active development and redevelopment projects along Smith Street, Wyman Street, Second Avenue, Bear Hill Road, and Winter Street in Waltham; and active construction of a new Minuteman Vocational Technical High School in Lincoln.
|
|
|
pdf
|
2017 Site Monitoring Report
Highlights include: Commencement of construction for the Drainage and Community Gardens project at Fresh Pond Reservation; proposed and ongoing development and redevelopment projects along Second Avenue, Bear Hill Road, and Winter Street in Waltham; and permitting and on-ongoing construction of a new Minuteman Vocational Technical High School in Lexington and Lincoln.
|
|
|
png
|
2016CALMAnalysis
Tabular results of LC Analysis from 2016 data
|
|
|
pdf
|
2016 Site Monitoring Report
Highlights include: Drainage improvements to the perimeter road at Fresh Pond at Glacken Slope, and completed Route 2 Bridge reconstruction and Rt. 128 resurfacing which included new best management practices.
|
|
|
pdf
|
2016 Annual Water Quality Report
2016 Annual Water Quality Report
|
Brochure
|
Water Department
|
pdf
|
2015 Site Monitoring Report
Highlights include: a proposed wet meadow restoration project in Weston, ongoing construction and improvements along Route 2 and 128 that will result in 5 new stormwater treatment and spill containment basins, improvements to 8 existing basins along Route 128, and the creation of vegetated swales in the Route 2 median.
|
|
|
pdf
|
2014 Source Water Quality Report
The 2014 Source Water Quality Report.
|
Watershed
|
Reports
|
pdf
|
2014 CCR
Cambridge Water Department 2014 CCR
|
|
|
pdf
|
2013 Source Water Quality Report
The annual source water quality report for 2013.
|
Watershed
|
Reports
|
|
2013 Fire Hydrant Flushing Schedule
2013 Fire Hydrant Flushing Schedule
|
|
|