pdf
|
Annual Water Quality Report 2010
Annual Water Quality Report 2010
|
Publication
|
|
pdf
|
Annual Water Quality Report 2011
Annual Water Quality Report 2011
|
Publication
|
|
pdf
|
Water Construction Permits Conditions for Approval
Water Construction Permits Conditions for Approval
|
Publication
|
|
pdf
|
Fresh Pond Reservation Use Permit
Downloadable pdf of the Fresh Pond Reservation User Permit Request Form.
|
Permit
|
|
pdf
|
Pod Patrol Information Page
Informational flier for the Cambridge Pod Patrol.
|
Fresh Pond Reservation
|
Resource Guide
|
pdf
|
2016 Annual Water Quality Report
2016 Annual Water Quality Report
|
Brochure
|
Water Department
|
pdf
|
Water Department Tour Request Form
Fresh Pond, Water Department Tour Request Form
|
Application Form
|
Water Department
|
|
2013 Fire Hydrant Flushing Schedule
2013 Fire Hydrant Flushing Schedule
|
|
|
pdf
|
2014 CCR
Cambridge Water Department 2014 CCR
|
|
|
pdf
|
2015 Site Monitoring Report
Highlights include: a proposed wet meadow restoration project in Weston, ongoing construction and improvements along Route 2 and 128 that will result in 5 new stormwater treatment and spill containment basins, improvements to 8 existing basins along Route 128, and the creation of vegetated swales in the Route 2 median.
|
|
|
pdf
|
2016 Site Monitoring Report
Highlights include: Drainage improvements to the perimeter road at Fresh Pond at Glacken Slope, and completed Route 2 Bridge reconstruction and Rt. 128 resurfacing which included new best management practices.
|
|
|
png
|
2016CALMAnalysis
Tabular results of LC Analysis from 2016 data
|
|
|
pdf
|
2017 Site Monitoring Report
Highlights include: Commencement of construction for the Drainage and Community Gardens project at Fresh Pond Reservation; proposed and ongoing development and redevelopment projects along Second Avenue, Bear Hill Road, and Winter Street in Waltham; and permitting and on-ongoing construction of a new Minuteman Vocational Technical High School in Lexington and Lincoln.
|
|
|
pdf
|
2018 Site Monitoring Report
Highlights include: Completion of the Drainage and Community Gardens project at Fresh Pond Reservation; drainage improvements along the Hobbs Brook Reservoir dam crest (Winter St) in Waltham; proposed, completed, and active development and redevelopment projects along Smith Street, Wyman Street, Second Avenue, Bear Hill Road, and Winter Street in Waltham; and active construction of a new Minuteman Vocational Technical High School in Lincoln.
|
|
|
pdf
|
2019 Algae Monitoring Report
This report presents the 2019 results from CWD's Algae Monitoring Program, part of an on-going study to assess source water quality in Cambridge reservoirs.
|
|
|