- Department Home Page
- Community Planning
- Economic Development
- Environmental and
Transportation Planning - Housing
- Community Development Block Grant
- About the Department
- Popular Services
- Community Calendar
- Contact Us
- Demographics
- Forms
- Housing Services
- Maps
- Parks and Open Space
- Planning Board Agenda
- Publications
- Zoning Ordinance and Map
- Site Map
- About This Web Site
Use the Site Map to navigate
the site
Western Avenue Reconstruction
What's New
PROJECT
BOOKLET HOT OFF THE PRESS! Please take a look at our project booklet, which provides a great summary of the conceptual design process, and
provides details of several design concepts.
If you would like a copy mailed to you, or others you think should receive it, please email the addresses to Jeff Rosenblum, jrosenblum@cambrigema.gov. This
file is in PDF format and requires use of the free Adobe Acrobat viewer.
- Conceptual Design Booklet (5.4 MB)
- We are seeking input from the public on the conceptual design concepts that have been developed. Comments will be accepted until July 19, 2010. Now is your opportunity to provide us with feedback on this important project! Please use this link: http://www.surveymonkey.com/s/66TLB2H.
Join
the Western Avenue email list and learn about the project:
If you would prefer to receive notifications by postal mail please use this form.
Take a quick survey about Western Avenue
View a summary handout about the project
View a flyer distributed to residents in January 2010. This file is in PDF format and requires use of the free Adobe Acrobat viewer.
Community Walks
These informal walks are led by city staff with occasional outside guests. The walks provide opportunities for neighbors to learn more about the project, and provide input to city staff. The walks are free and open to the public. Each walk will start near Central Square, goes down Western Avenue to the Charles River, and back.
View some photos of past walks
Upcoming Walks
- None Scheduled
Past Walks
- Concepts Walk: Sunday June 27, 2010, 4:00 P. M. Meet at Andala Café. Click here for map. Led by Jeff Rosenblum, Project Manager for Western Avenue surface design, Community Development Department.
- Project Overview Walk: Monday April 5, 2010, 6:00 P. M. to 7:30 P. M. Meet at Andala Café. Click here for map. Led by Jeff Rosenblum, Project Manager for Western Avenue surface design, Community Development Department
- Human Centered Design Walk: Monday April 12, 2010,6:00 P. M. to 7:30 P. M. Meet at Au Bon Pain. Click here for map. Led by Chris Hart, Institute for Human Centered Design and Michael Muehe, Executive Director, Cambridge Commission for Persons with Disabilities.
- Traffic, Signals, and Stop Signs Walk: Monday April 26, 2010, 6:00 P. M. to 7:30 P. M. Meet at Andala Café. Click here for map. Led by Jeff Parenti, City Traffic Engineer.
All walks will be held RAIN or SHINE. In the event of rain, we will sit inside for part of the time before the walk.
About the Project
Western Avenue is scheduled to be fully reconstructed. The underground stormwater system, utilities, the roadway and the sidewalks will all need to be replaced. The redesign will consider all street users: walkers, bicyclists, bus riders and drivers. The redesign process is about to begin and will consider traffic patterns, lighting, trees, green space and environmentally friendly features.
This is an opportunity for the community to discuss changes that would make Western Avenue more neighborhood-friendly.
The community design process will run from Jan. through June 2010, followed by engineering design. Construction is expected to begin in summer 2011. There will be advisory committee meetings, community meetings and neighborhood walks to discuss the project.
Western Avenue has seen many changes since it was first constructed in 1824. In 1949, the street was changed from 2-way, with trolley cars running down the center, to one-way street as it is today. Once a manufacturing and commercial center, the area is now primarily residential.
Return to Top
Community-wide Public Meetings
These files are in PDF format and require use of the free Adobe Acrobat viewer.
| #1 | March 31, 2010 | Meeting notes | Presentation: color; grayscale Photos |
|
| #2 | June 29, 2010 | Meeting notes | Handout: Project Booklet |
All community-wide public meetings will be held at the Citywide Senior Center at 806 Massachusetts Avenue in the Walter Milne Ballroom, from 6:00 - 8:00 PM (unless otherwise noted). View location map.
Western Avenue community-wide public meetings are also listed on the citywide Calendar of Events.
Advisory Committee
In January, 2010, the City of Cambridge appointed an advisory committee to represent a cross-section of resident and business interests in the corridor. Advisory committee members will participate in meetings and discussions, review written material, and advise the city on design issues associated with the reconstruction of the Western Avenue corridor. These issues range from overall design of the street as a multi-modal corridor, to discussing surface material, lighting and plantings/green space.
Members of the Committee:
Lawrence Adkins, Bill August, Mertin Betts, Velmer Brooks, Kathy Cannon, Abdullah Daoud, Reuben Dottin, Caitlin Gallagher, David Gibbs, Marvin Gilmore, Erin Gullage, Megan Krey, Marc Leuchner, Bob Nesson, Brad Nissenbaum, Eran Segev, Anne Shuhler, Artis Spears, Pastor Lawrence Ward.
Meeting Dates, Agendas, Notes and Materials:
These files are in PDF format and require use of the free Adobe Acrobat viewer.
| #1 | February 23, 2010 |
Agenda | Meeting notes | Presentation: color; grayscale |
| #2 | March 16, 2010 |
Agenda | Meeting notes | Presentation |
| #3 | April 15, 2010 |
Agenda | Meeting notes | Presentation: Street Design 101 |
| #4 | April 27, 2010 |
Agenda | Meeting notes | Presentations: (a) Environmentally friendly design (b) Sidewalks fit for people (c) Streetscape Landscaping 101 |
| #5 | May 26, 2010 |
Agenda | Meeting notes | Presentations: |
| #6 | June 17, 2010 |
Agenda | Meeting notes | |
| #7 | July 27, 2010 |
All advisory committee meetings will be
held at the Citywide Senior Center at 806
Massachusetts Avenue in the Walter Milne Ballroom, from 7:00 - 9:00 PM (unless otherwise noted). View location map.
Western Avenue Reconstruction Advisory
Committee meetings are also listed on the citywide Calendar of Events.
Resources
These files are in PDF format and require use of the free Adobe Acrobat viewer.
- Conceptual Design Booklet (5.4 MB)
- View the transportation section of the Cambridge Growth Policy, 2007 update.
- View the Cambridge Climate Protection Plan.
- View the Riverside Neighborhood Map.
- View a map of Western Avenue non-residential uses.
- View the Cambridge Zoning Map.
- Viewthe Cambridge Bicycle Facilities Map.
- View a map of Western Avenue. View the following detailed maps:
- View a map of Bus Routes in Central Square
- View the results of the Travel Time Study
- View a map showing Vehicle Traffic Volumes
- View the results of the Bicycle and Pedestrian Count Study
- View a map showing Queues During Peak Hours
- View the results of the Parking Occupancy Study
- View a map showing Existing Trees Along the Corridor
- View a map showing the River Street and Western Avenue Bridges
For More Information
For more information about the Western Avenue Reconstruction project call Jeff Rosenblum, jrosenblum@cambridgema.gov, at 617/349-4615. The Community Development Department TTY line is 617/349-4621.
Sign
up to receive updates by email or postal mail.
Return
to Roadway, Sidewalk and Path Projects
Return
to Environmental and Transportation Planning Division
Return to Community
Development Department Home
