Cambridge Community Development Department
 city manager city council mayor's office departments paybills jobs calendar cityhome
 
Community Development Department header with picture of 344 Broadway Link to Cambridge home page Information about 344 Broadway, a green building Link to Community Development Department home page
Divisions & Programs Top Links

Use the Site Map to navigate
the site

Western Avenue Reconstruction

What's New

Click link to PROJECT BOOKLET HOT OFF THE PRESS! Please take a look at our project booklet, which provides a great summary of the conceptual design process, and provides details of several design concepts. If you would like a copy mailed to you, or others you think should receive it, please email the addresses to Jeff Rosenblum, jrosenblum@cambrigema.gov. This file is in PDF format and requires use of the free Adobe Acrobat viewer.

  • Conceptual Design Booklet (5.4 MB)
  • We are seeking input from the public on the conceptual design concepts that have been developed. Comments will be accepted until July 19, 2010. Now is your opportunity to provide us with feedback on this important project! Please use this link: http://www.surveymonkey.com/s/66TLB2H.

Click link toJoin the Western Avenue email list and learn about the project:

Click link toIf you would prefer to receive notifications by postal mail please use this form.

Click link toTake a quick survey about Western Avenue

Click link toView a summary handout about the project

Click link toView a flyer distributed to residents in January 2010. This file is in PDF format and requires use of the free Adobe Acrobat viewer.

Community Walks

These informal walks are led by city staff with occasional outside guests. The walks provide opportunities for neighbors to learn more about the project, and provide input to city staff. The walks are free and open to the public. Each walk will start near Central Square, goes down Western Avenue to the Charles River, and back.

Click link toView some photos of past walks

Click link to Upcoming Walks

Click link to Past Walks

  • Concepts Walk: Sunday June 27, 2010, 4:00 P. M. Meet at Andala Café. Click here for map. Led by Jeff Rosenblum, Project Manager for Western Avenue surface design, Community Development Department.
  • Project Overview Walk: Monday April 5, 2010, 6:00 P. M. to 7:30 P. M. Meet at Andala Café. Click here for map. Led by Jeff Rosenblum, Project Manager for Western Avenue surface design, Community Development Department
  • Human Centered Design Walk: Monday April 12, 2010,6:00 P. M. to 7:30 P. M. Meet at Au Bon Pain. Click here for map. Led by Chris Hart, Institute for Human Centered Design and Michael Muehe, Executive Director, Cambridge Commission for Persons with Disabilities.
  • Traffic, Signals, and Stop Signs Walk: Monday April 26, 2010, 6:00 P. M. to 7:30 P. M. Meet at Andala Café. Click here for map. Led by Jeff Parenti, City Traffic Engineer.

All walks will be held RAIN or SHINE. In the event of rain, we will sit inside for part of the time before the walk.

About the Project

Western Avenue is scheduled to be fully reconstructed. The underground stormwater system, utilities, the roadway and the sidewalks will all need to be replaced. The redesign will consider all street users: walkers, bicyclists, bus riders and drivers. The redesign process is about to begin and will consider traffic patterns, lighting, trees, green space and environmentally friendly features.

This is an opportunity for the community to discuss changes that would make Western Avenue more neighborhood-friendly.

The community design process will run from Jan. through June 2010, followed by engineering design. Construction is expected to begin in summer 2011. There will be advisory committee meetings, community meetings and neighborhood walks to discuss the project.

Western Avenue has seen many changes since it was first constructed in 1824. In 1949, the street was changed from 2-way, with trolley cars running down the center, to one-way street as it is today. Once a manufacturing and commercial center, the area is now primarily residential.

Return to Top

Community-wide Public Meetings

These files are in PDF format and require use of the free Adobe Acrobat viewer.

#1 March 31, 2010

Invitation

Agenda

Meeting notes Presentation: color; grayscale
Photos
#2 June 29, 2010

Invitation

Agenda

Meeting notes

Handout: Project Booklet
Photos

Click link toAll community-wide public meetings will be held at the Citywide Senior Center at 806 Massachusetts Avenue in the Walter Milne Ballroom, from 6:00 - 8:00 PM (unless otherwise noted). View location map.

Click link toWestern Avenue community-wide public meetings are also listed on the citywide Calendar of Events.

Advisory Committee

In January, 2010, the City of Cambridge appointed an advisory committee to represent a cross-section of resident and business interests in the corridor. Advisory committee members will participate in meetings and discussions, review written material, and advise the city on design issues associated with the reconstruction of the Western Avenue corridor. These issues range from overall design of the street as a multi-modal corridor, to discussing surface material, lighting and plantings/green space.

Members of the Committee:

Lawrence Adkins, Bill August, Mertin Betts, Velmer Brooks, Kathy Cannon, Abdullah Daoud, Reuben Dottin, Caitlin Gallagher, David Gibbs, Marvin Gilmore, Erin Gullage, Megan Krey, Marc Leuchner, Bob Nesson, Brad Nissenbaum, Eran Segev, Anne Shuhler, Artis Spears, Pastor Lawrence Ward.

Meeting Dates, Agendas, Notes and Materials:

These files are in PDF format and require use of the free Adobe Acrobat viewer.

Click link toAll advisory committee meetings will be held at the Citywide Senior Center at 806 Massachusetts Avenue in the Walter Milne Ballroom, from 7:00 - 9:00 PM (unless otherwise noted). View location map.

Click link toWestern Avenue Reconstruction Advisory Committee meetings are also listed on the citywide Calendar of Events.

Return to Top

Resources

These files are in PDF format and require use of the free Adobe Acrobat viewer.

Return to Top

For More Information

For more information about the Western Avenue Reconstruction project call Jeff Rosenblum, jrosenblum@cambridgema.gov, at 617/349-4615. The Community Development Department TTY line is 617/349-4621.

Click link toSign up to receive updates by email or postal mail.

Return to Top

 

Click link toReturn to Roadway, Sidewalk and Path Projects

Click link toReturn to Environmental and Transportation Planning Division

Click link toReturn to Community Development Department Home

 

© 2004 - 2009 Community Development Department, City of Cambridge, Massachusetts

City Home  |   search   |   publications   |   jobs   |   contact us  |   directions  |   disclaimer   |   CDD Home