Mechanical Fees

Section: 15.04.010 Established-Work Started Prior to Obtaining Permit:

Where work for which a permit is required by this code is started or proceeded with, prior to obtaining such permit, the fee specified shall be tripled, but payment of such triple fee shall not relieve any person from fully complying with the requirements of this code in the execution of the work not from any other penalties prescribed in this code.

City Ordinance 15.08. & 15.12 Penalty for Starting Work Prior to Obtaining Permit:

Where work for which a permit is required by Electric Code/Plumbing Code is started or proceeded with, prior to obtaining such permit, the fee specified shall be tripled, but payment of such triple fee shall not relieve any person from fully complying with the requirements of this code in the execution of the work not from any other penalties prescribed in this code.

City Ordinance 15.08.020 & 15.12.020 Co-Work Completed By Others:

Any person, firm or corporation, other than electrical contractors/plumbing contractors or public service agencies, who employ one or more electricians/plumbers permanent to do electrical or plumbing work, may obtain a permit covering the work done by such permanent electrician/plumber for a period of time to be determined in each case.  The fee for electrical work/plumbing work done under such a permit for a period of time to be work done under such permit will be charged in the same manner as if separate permits had been given for each job.

ITEMSUBITEMFEE
Air Conditioners - no permit required for portable room units  
 Up to 25 ton units$40
 Over 25 ton unit$6.00 per ton
Air Handling Units Duct Coils $50
Bathroom Ventilation Fan (Residential) $20.00
Cooling Towers  
 Up to 25 ton units$40
 Over 25 ton unit$6.00 per ton
Direct Vent Fire Place $100
Draft Inducer $75
Ductless Split System $40
Evaporative Coolers $25
Fan Coils $20
Final InspectionFailure to call within 10days after completion$50
Gas Generator $50
Gasoline Traps/Sand $150
High Pressure units:  
 15 PSI or over$60
 Each additional 5 PSI$12
Hydro Air System $75
Incinerator $150
Kickspace Heater $25
Kitchen Equipment $150
No Vent Heating $25
Pool Heater $150
Process Piping $25.00 Every 200' of pipe
Pumps Heat $25
Radiant Heat $50
Range Hoods Res. $25
Refrigeration Units $100
Roof type combination air conditioner and heat  
 Up to 25 ton units$40
 Over 25 ton unit$10.00 per ton or fraction
Steam Generator $100
Steam Kettles $50
Stove Hoods Commercial $100
Solar Heat $50.00 each system
Temporary Heat & LP Installation $100
Ventilation Fan (Commercial) $50.00