Plumbing/Gas Fees

Section: 15.04.010 Established-Work Started Prior to Obtaining Permit:

Where work for which a permit is required by this code is started or proceeded with, prior to obtaining such permit, the fee specified shall be tripled, but payment of such triple fee shall not relieve any person from fully complying with the requirements of this code in the execution of the work not from any other penalties prescribed in this code.

City Ordinance 15.08. & 15.12 Penalty for Starting Work Prior to Obtaining Permit:

Where work for which a permit is required by Electric Code/Plumbing Code is started or proceeded with, prior to obtaining such permit, the fee specified shall be tripled, but payment of such triple fee shall not relieve any person from fully complying with the requirements of this code in the execution of the work not from any other penalties prescribed in this code.

City Ordinance 15.08.020 & 15.12.020 Co-Work Completed By Others:

Any person, firm or corporation, other than electrical contractors/plumbing contractors or public service agencies, who employ one or more electricians/plumbers permanent to do electrical or plumbing work, may obtain a permit covering the work done by such permanent electrician/plumber for a period of time to be determined in each case.  The fee for electrical work/plumbing work done under such a permit for a period of time to be work done under such permit will be charged in the same manner as if separate permits had been given for each job.

GASMinimum Fee $25Re-Inspection $50
ITEMSUBITEMFEE
Breaching  $100.00
Chimney Liner $50.00
Code violation inspection $50.00
Demolition $50.00
Disconnect/Re-Connect $50.00
Fryolater $30.00
Gas fitting new and alteration  
 up to $300.00$50.00
 $301.00 to $2000.00$80.00
 over $2000.00$80.00 plus $6.00 per $1000 or fraction thereof of construction
Gas generator $50.00 (plus mechanical permit)
Gas meter $25.00
Gas test $25.00
 Re-test$30.00
Heating units $25.00
 Conversion burner$50.00
 Direct vent heater$50.00
 Fireplace Insert$30.00
 Furnace/Hot air$50.00
 Laboratory cock$20.00
 Pool heater$50.00
 Vent free room heater$50.00
Hot water heater  $50.00
Make up airforced/gravity$50.00
Outdoor cooking/Decorative appliances $50.00
Oven,Cook Stove, Vented Space Heater, Grille & Dryer $20.00
Re-Inspection $50.00
Roof top units $40.00
Solenoid valve $50.00
Temporary heat $100 (plus mechanical permit)
Vent Dampeer $75.00
   
PLUMBINGMinimum Fee $50Re-Inspection $50
ITEMSUBITEMFEES
Annual sprinkler test $30.00 plus $2.00 for additional sprinkler head
Backflow preventer  
 Non-testable (9D)$20.00
 Testable$50.00
Chip Tank $50.00
Dental/Pedicure Chair $25.00
Dis-connect/Re-Connect $50.00
Fire lanes or standpipe installation $40.00
 Additional hose outlets$50.00
Fixtures, New/Alteration: area drain, dishwasher, disposal, drinking fountain, floor drain, laundry tray, lavatory, roof drain, shower stall, sink, slop sink, toilet, urinal  
 up to 5 fixtures$50.00
 6 & above each fixture$5.00
Flushing Rim Sink $50.00
Food Prep Sink/indirect $50.00
Grease trap $50.00
Hot water heater (electric) $30.00
Hot water heater (gas) $50.00 (plus gas permit)
Hot water tankless $50.00
Inspections  
 Failure to call for final inspection within 5 working days of completion$50.00
 Re-inspection of code violation$50.00
PH Neutralized Tank $100.00
RO/Filter Water System $50.00
RO/Filter Water Outlet $5.00 each
Sanitary Waste Piping $100.00
Solar/Hybrid System $100.00
Sprinklers  
 up to 5 heads$50.00
 over 5 headsPlus $2.00 each for additional head
Water piping $15.00
Water Meter $25.00
Water Meter for Irrigation (2nd) $25.00
Water piping $15.00