Longfellow Road

Reconstruction of Longfellow Road that will incorporate a shared street design and new landscaping.

August 25, 2014

There is no work scheduled for Longfellow Road this week.

---------------------------------------------------------------------------------

August 18, 2014

This week, crews continue to perform sidewalk work on Longfellow Road. Longfellow Road will be closed on most week days during general hours (Monday thru Friday, 7am-4pm).

----------------------------------------------------------------------------------

August 4, 2014

This week, crews will continue to perform sidewalk work. Longfellow Road will be closed on most week days during general hours (Monday thru Friday, 7am-4pm).

 

Phases of Construction 

• Beginning May 6, 2013, three (3) catch basins and one (1) manhole will be installed to improve drainage.

• Later in May 2013, NStar Gas will replace their gas main on Longfellow Road. A separate notice will be delivered to residents before this work begins. 

• After NStar Gas is completed, the city’s contractor will return to Longfellow Road to reconstruct the road, driveways and enhanced planting areas. A separate notice will be delivered prior to this work beginning.

 

 

 

Project Background
The design of Longfellow Road was completed in close collaboration with residents. Community meetings were held in March and April of 2012.

Longfellow Road will be transformed into a residential shared street, which will:

• Provide extensive opportunities for street trees and other plantings.

• Improve deteriorating roadway and sidewalk infrastructure.

• Provide an accessible path for pedestrians.

• Enhance the area for all users.

 

 What to Expect During Construction
• General work hours will be 7am – 4pm, Monday thru Friday. If any night or weekend work is required by the contractor, you will be notified with a separate notice.

• If the project requires a street closure, you will be notified in advance.

• “No Parking” signs will be posted at least 24 hours in advance of construction; please be sure to check posted signs for exact dates and times.

• When work occurs directly in front of driveways or entryways, the contractor will coordinate access directly with residents and businesses.

  • Longfellow Road
  • Longfellow Road Landscaping

To sign up to receive email updates as the project moves forward, or if you need to arrange an accommodation or continuation of special services for anyone with a disability or special need, please contact Chris Neil, Community Relations Manager at 617.349.4825 or cneil@cambridgema.gov.

 

How can we help you? I'd like...

Mobile Cambridge

Keeping you connected wherever you are. Learn more about Mobile Cambridge

FAQ's

Have a question?
Find the answer in our extensive
Frequently Asked Questions

Dept of Public Works

147 Hampshire St
Cambridge MA 02139

Phone:617.349.4800
TDD:617.499.9924

Hours of Service

Monday: 8:30am-8:00pm
Tuesday-Thursday: 8:30am-5:00pm
Friday: 8:30am-12 noon
24 Hour emergency 617.349.4860

RECYCLING CENTER HOURS

Tuesday & Thursday: 4:00pm-7:30pm
Saturday: 9:00am-4:00pm

Owen O'Riordan
Commissioner