Standard Details

The following are standard details for construction of public infrastructure in the City of Cambridge.  Please contact the Information Desk at 617.349.4811 for additional information.

PDF-Format Details 
 click to view
 right click / 'save target as' to download
  
 All Details - Complete Set as of 4/14/2011 (6.4 meg)

 Construction Erosion Control BMPs (February 2012)

    Structures
        Single Grate Catchbasin
        Double Grate Catchbasin
        Drop Inlet Catchbasin (Plan)
        Drop Inlet Catchbasin (Section)
        Type 3 and 4 Catchbasins
        Standard Manhole
        Doghouse Manhole 1
        Doghouse Manhole 2
        Doghouse Manhole 3
        Inside Drop Manhole
        Sump Manhole
        Manhole General Notes
        Box Culvert Section 1
        Box Culvert Section 2
        Storage Tank Section 1
        Storage Tank Section 2

    Pipe
        Saddle Connection
        Tee Connection
        Chimney Connection
        Flexible Sleeve Connection
        Pipe Connection Materials Table
        Cast-In-Place Field Closure
        Pipe Wall Sleve Closure
        Utility Crossing
        Water Main Crossing
        Trench Detail
        Trench Dam Detail

 

Sidewalk
        Brick Sidewalk (Plan)
        Brick Sidewalk (Section, Asphalt Base)
        Brick Sidewalk (Section, Concrete Base)
        Curb Section (Bituminous Concrete)
        Curb Section (Sloped Granite)
        Curb Section (Vertical Granite)
        Driveway Apron (Bituminous)
        Driveway Apron (Brick)
        Driveway Apron (Concrete)
        Parking Meter Post Installation
        Sidewalk Expansion Joint

 

    Pavement
        Trench Patch
        Cold Plane and Overlay Joint
        Full Depth Joint
        Raising of Castings
        Crosswalk Markings
        Raised Crosswalk / Raised Intersection

    Common Manhole Separation
        Storm Drain Bypass
        Sanitary Bypass
        Convert to Drain Manhole
        Convert to Sanitary Manhole
        End of Line Manhole

    Traffic Management
        Pedestrian Bypass
        Cyclist Accommodations
        Single Lane Closure
        Interior Lane Closure
        One-Lane Bi-Directional
        Two-Way Alternating Traffic
        Two-Way Lane Shift
        Signage Chart
        General Notes / Legend

 

    Trees
        Deciduous Tree Planting    

    Erosion Control
        Construction BMPs

        Catch Basin Protection 1 
        Catch Basin Protection 2 
        Catch Basin Protection 3 
        Catch Basin Protection 4 
        Catch Basin Protection 5 
        Construction Entrance 
        Erosion and Sediment Control Notes 
        Fiber Role Temporary Stockpile Protection 
        Silt Fence
        Super Silt Fence

    Survey
        Boundary Monument

    Fence
        Chain Link Fence 1
        Chain Link Fence 2        

    Concrete
        Wire Fabric Detail
        Epoxy Dowell Detail

DISCLAIMER

These Standard Specifications, Guidelines, and Standard Details have been prepared as a service and accommodation to City staff, engineers, developers, utility companies, contractors, and/or other interested parties doing work in the City of Cambridge, MA. The information is offered in good faith and is believed to be accurate at the time of its preparation and is provided without any warranty, expressed or implied. It is not intended to be site or project specific, and the user is advised to exercise appropriate engineering and construction judgment, knowledge, and experience in applying all or a portion of these documents for a specific project. Where necessary, additional engineering, construction, legal, or other expert support may be required and should be sought.

The City of Cambridge assumes no responsibility or liability associated with the use or intended use of these documents. The use of these documents shall in no way relieve the user of its responsibility in performing to the applicable standard of care in preparing, applying, and implementing such documents.

It should be understood that these documents are not intended to address all possible areas/types of construction within Cambridge. Any deviations, changes, modifications, revisions, or supplemental documents shall be reviewed by Cambridge Department of Public Works Engineering Division prior to construction.

The user shall be responsible for verifying the most recent version of these documents prior to such use.

These documents shall only be used on a City of Cambridge project, as applicable. Any use or misuse of these documents is subject to legal enforcement/action by the City of Cambridge.

 

How can we help you? I'd like...

Dept of Public Works

147 Hampshire St
Cambridge MA 02139

Phone:617.349.4800
TDD:617.349.4805

Hours of Service

Monday: 8:30am-8pm
Tuesday-Thursday: 8:30am-5pm
Friday: 8:30am-12pm

Cambridge Mobile Apps

Cambridge iReport Promo  
Keeping you connected wherever you are.  Learn more about Mobile Cambridge 

 

FAQ's

Have a question?
Find the answer in our extensive
Frequently Asked Questions