Huron B Improvements

The Huron B Project includes the streets listed below. To view streetscape plans, please click on the street name.

2016 Updated
Streetscape Plans

Appleton Street North
Appleton Street South
Blakeslee Street
Chilton Street
Fayerweather Street North
Fayerweather Street South
Granville Road
Gurney Street
Huron Avenue
Hutchinson Street
Manassas Avenue
Reservoir Street North
Reservoir Street South
Royal Avenue
Saville Street
Vassal Lane
Walden Street
Wyman Road

Alewife Sewer Separation Project - Construction Update for August/September 2016

Traffic Pattern Change Notice: Standish Street traffic flow will be REVERSED (towards Huron Avenue), 24- hours a day, and will continue in this direction until further notice.

Signs will be posted to direct vehicles through this traffic change, which is expected to last a few months in duration. You will receive an additional notification when the traffic is reversed back to the original northbound pattern. Construction day parking restrictions and traffic detours will continue to be signed on a daily basis. We ask that you take extra care when driving down this street and obey all traffic and parking signs. On-street parking will still be allowed during this time. Street sweeping and City services will remain in effect.

Click here to view this week’s traffic map.

Week of October 24th – October 28th
Activity Description:

• Huron (Fresh Pond Parkway to Lakeview) – Roadway r econstruction
• Reservoir – Sidewalk work
• Walden – Underdrain work
• Project wide- Back of sidewalk restoration, punch list, paving prep, utility repairs and general clean-up
Streets Impacted: Huron Avenue, Reservoir Street and Walden Street

Week of October 31st – November 4th (anticipated activity)
Activity Description:

• Chilton (Huron to Vassal) – Paving
• Gurney – Paving
• Huron (Fresh Pond Parkway to Lakeview) – Roadway r econstruction
• Reservoir (Huron to Vassal) – Paving
• Saville/Walden Intersection - Raised crosswalk work
• Vassal/Walden Intersection – Raised crosswalk work
• Vassal (Fayerweather to Huron) – Paving
• Vassal – Lateral repairs
• Project wide- Back of sidewalk restoration, punch list, paving prep, utility repairs and general clean-up
Streets Impacted: Chilton Street, Gurney Street, Huron Ave, Reservoir Street, Saville Street, Vassal Lane and Walden Street

Additional Resident Engineer Notes:
• Test pits ongoing
• Paving ongoing

Resident Engineer: Bruno Cardarelli at (617) 799-4374

Contact Information:
For any questions, concerns, or assistance with this project, or to sign up to receive project specific email updates, please contact KyAnn Anderson, Community Relations Manager, at (617) 498-4708 /
In case of emergency after hours or on weekends, please call the DPW 24-Hour line at (617)-349-4800

April 2016

Please click here to view the latest project schedule.

Huron Avenue Contract B Overall Schedule

  • Preliminary Design: May 2012-December 2012
  • Final Design: December 2012-May 2013
  • Construction Begins summer 2013

Please see updates tab for more detailed, current schedule for events.

Project Background

Huron Ave Contract A, Huron Ave Contract B and the Concord Ave Contract are part of the Massachusetts Water Resources Authority’s (MWRA) Long Term Combined Sewer Overflow (CSO) Control Plan for the Alewife Brook. Sewer separation and stormwater management in these contract areas will separate existing combined sewers and provide dedicated sanitary sewers and stormwater drains.

About The Design

The principal goals of this project are to improve water quality in the Alewife Brook by eliminating combined sewer overflows; protect Fresh Pond Reservoir from potential contaminants; and, control the occurrences of street flooding and sewer and stormwater backups on public and private properties. Prior to beginning design, building and system investigation for the entire project area will be undertaken by the City’s consultants. Investigations will attempt to determine how and where discharges from the sanitary sewer, sump pump, yard drain, driveway drain, stairwell drain and roof drains leave private property. The design of the infrastructure work will include upgrades of water, cable, gas, electric as part of these contracts.

The City will work with the community in developing an approach to surface improvements that address pedestrian, vehicular, landscaping, and environmental concerns. Community meetings will be held to discuss neighborhood concerns and potential design solutions.

Huron Avenue

As part of the Huron B project, Huron Avenue, from Concord Ave to Fresh Pond Parkway, will be full reconstructed. The City's Community Development Department will manage the community process for Huron Avenue. For more information, please visit the Huron Avenue webpage.

Cambridge Department of Public Works
147 Hampshire Street

Office hours are Mondays, 8:30 AM to 8 PM
Tuesday through Thursday, 8:30 AM to 5 PM
Fridays, 8:30 AM to 12 noon

For information related to the project design, including Huron Avenue, please contact Project Manager Kara McSweeney Falise at 617.349.4827 or

For any questions, concerns, or assistance related to construction, or to sign up to receive project
specific email updates, please contact KyAnn Anderson, DPW’s Community Relations Manager, at (617) 498-4708 or

How can we help you? I'd like...

Service Requests

Commonwealth Connect Promo

Cambridge citizen requests, now online & on the go! Report issues here.


Have a question?
Find the answer in our extensive
Frequently Asked Questions

Dept of Public Works

147 Hampshire St
Cambridge MA 02139


Hours of Service

Monday: 8:30am-8:00pm
Tuesday-Thursday: 8:30am-5:00pm
Friday: 8:30am-12 noon
24 Hour emergency 617.349.4860


Tuesday & Thursday: 4:00pm-7:30pm
Saturday: 9:00am-4:00pm

Owen O'Riordan