Chapter 90 Contract 13

Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St


This project has been completed. No further updates to this project page will be made.

Project completed.

 

 

Chapter 90 contracts are funded by the state and managed by the Public Works Department. They are a major portion of the Engineering Division's five year plan. Construction generally includes surface enhancements such as pavement, sidewalk and pedestrian ramp reconstruction, traffic calming, and greenscaping. Minor stormwater management is also occasionally included.

View this page at www.ma.gov for more information.

 

The project includes:

 

Chauncy Street (Massachusetts Ave to Garden St)

  • New water services (select locations), catch basins, pedestrian ramps, and roadway paving.

 

Upland Road (Raymond St to Huron Ave)

  • New water services (select locations), catch basins, sidewalks, pedestrian ramps, roadway paving.
  • Traffic elements, including a curb extension on Upland Rd at Newell St, and one on Huron Ave at the intersection of Huron and Upland.

 

Lowell Street (Brattle St to Mt. Auburn St)

  • New catch basins, sidewalks, pedestrian ramps, roadway paving.

 

Pemberton Street (Massachusetts Ave to Fairfield St)

  • New sidewalks, pedestrian ramps, roadway paving.

 

Henry Street (Brookline St to Pearl St)

  • New sidewalks, pedestrian ramps, roadway paving.

 

Cambridge Department of Public Works
147 Hampshire Street

rfuentes@cambridgema.gov

Work hours are 7 AM to 4 PM
Monday through Friday

 

If you need additional information or assistance related to this work, please contact project manager Hussein Musa at 617.349.4831 or by email at hmusa@cambridgema.gov .

For for accommodations or continuation of special services related to a disability or special need please contact Rebecca Fuentes: 617.349.6948/ rfuentes@cambridgema.gov.

For 24-hour emergency assistance please call 617.349.4800.