859 Massachusetts Ave Project
The City of Cambridge has purchased the building located at 859 Massachusetts Avenue formerly owned by the Chamber of Commerce. The City has decided to move the family shelter, formerly located at 3 Bigelow Street, into this location.
|
The City of Cambridge has purchased the building located at 859 Massachusetts Avenue formerly owned by the Chamber of Commerce. The City has decided to move the family shelter, formerly located at 3 Bigelow Street, into this location.
|
City Managers Office
|
Completed Project
|
Alewife Linear Park Restoration Project
There are several opportunities for tree canopy development in Alewife Linear Park
|
There are several opportunities for tree canopy development in Alewife Linear Park
|
Parks
|
In Planning
|
Amory Street Reconstruction
Reconstruction of Amory Street
|
Reconstruction of Amory Street
|
Streets and Sidewalks
|
Completed Project
|
Appleton Street Infrastructure Improvements Project
Highland Street to Brattle Street
|
Highland Street to Brattle Street
|
Sewer and Stormwater
|
Completed Project
|
Avon Hill Street and Hillside Ave Reconstruction Project
Avon Hill St & Hillside Ave are scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Avon Hill St & Hillside Ave are scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Belmont Street Reconstruction Project
Belmont Street Reconstruction Project
|
Belmont Street Reconstruction Project
|
Streets and Sidewalks
|
Current Construction
|
Binney Street Park
Binney Street Park, located between Binney Street and Broadway along Galileo Galilei Way, is one of three new City open spaces in eastern Cambridge. The design of the park was guided by the Eastern Cambridge/Kendall Square Open Space (ECKOS) Study and Connect Kendall Square Open Space Competition, which resulted in a framework plan for the overall network of open spaces in eastern Cambridge. This new park will feature a variety of tree plantings, a dog run, lounge and play surfaces, and will include a segment of the Grand Junction Greenway.
|
Binney Street Park, located between Binney Street and Broadway along Galileo Galilei Way, is one of three new City open spaces in eastern Cambridge. The design of the park was guided by the Eastern Cambridge/Kendall Square Open Space (ECKOS) Study and Connect Kendall Square Open Space Competition, which resulted in a framework plan for the overall network of open spaces in eastern Cambridge. This new park will feature a variety of tree plantings, a dog run, lounge and play surfaces, and will include a segment of the Grand Junction Greenway.
|
Parks
|
Current Construction
|
Binney Street Stormwater Utility Improvements Construction Project
The City of Cambridge and DivcoWest, the developer of NorthPoint, will be implementing storm water infrastructure improvements on Binney Street. The new drainage system will be installed in Binney Street from Cardinal Medeiros Avenue to the area west of Galileo Galilei Way, through the park area to Broadway. The system will be owned and maintained by the City of Cambridge.
|
The City of Cambridge and DivcoWest, the developer of NorthPoint, will be implementing storm water infrastructure improvements on Binney Street. The new drainage system will be installed in Binney Street from Cardinal Medeiros Avenue to the area west of Galileo Galilei Way, through the park area to Broadway. The system will be owned and maintained by the City of Cambridge.
|
Sewer and Stormwater
|
Completed Project
|
Brewster/Riedesel Reconstruction Project
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
|
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
|
Streets and Sidewalks
|
Completed Project
|
Broadway Improvements
Third Street to Ames Street
|
Third Street to Ames Street
|
Streets and Sidewalks
|
Completed Project
|
Broadway Reconstruction Project
Prospect Street to Portland Street
|
Prospect Street to Portland Street
|
Streets and Sidewalks
|
Completed Project
|
Brookline Street Reconstruction
Brookline Street Improvements (from Henry to Pacific)
|
Brookline Street Improvements (from Henry to Pacific)
|
Streets and Sidewalks
|
Completed Project
|
CAM400 Infrastructure Improvement Project
Includes Whittemore Ave, Harrison Ave, Seagrave Rd, Madison Ave, Magoun St, Columbus Ave, Kimball St, Kassul Pk, and Massachusetts Ave and Alewife Brook Pkwy Intersection
|
Includes Whittemore Ave, Harrison Ave, Seagrave Rd, Madison Ave, Magoun St, Columbus Ave, Kimball St, Kassul Pk, and Massachusetts Ave and Alewife Brook Pkwy Intersection
|
Sewer and Stormwater
|
Completed Project
|
Cambridge Common and Flagstaff Park
Rehabilitation of the Cambridge Common and Flagstaff Park
|
Rehabilitation of the Cambridge Common and Flagstaff Park
|
Parks
|
Completed Project
|
Cambridge Park Drive Area Drainage Improvements and Stormwater Wetland Project
Includes Wheeler St, Fawcett St, CambridgePark Dr, Acorn Park Dr, and the Alewife Reservation
|
Includes Wheeler St, Fawcett St, CambridgePark Dr, Acorn Park Dr, and the Alewife Reservation
|
Sewer and Stormwater
|
Completed Project
|
Cambridge Tunnel Reconstruction Project
Reconstruction of the Cambridge Tunnel and Overpass
|
Reconstruction of the Cambridge Tunnel and Overpass
|
Streets and Sidewalks
|
Completed Project
|
Central Square Public Toilet
As part of the City’s Participatory Budgeting process, $320,000 in the Fiscal Year 2016 Budget was allocated for a public toilet installation in Central Square.
|
As part of the City’s Participatory Budgeting process, $320,000 in the Fiscal Year 2016 Budget was allocated for a public toilet installation in Central Square.
|
Streets and Sidewalks
|
Completed Project
|
Centre Street and Dana Street Reconstruction Projects
Centre Street from Dana St. to Hancock St. and Dana Street from Cambridge Street to Mass Ave are scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Centre Street from Dana St. to Hancock St. and Dana Street from Cambridge Street to Mass Ave are scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
In Planning
|
Chapter 90 Contract 11
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2
|
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2
|
Streets and Sidewalks
|
Completed Project
|
Chapter 90 Contract 12
Includes Hubbard Ave, Robinson St, Cushing St, First St, Putnam Ave
|
Includes Hubbard Ave, Robinson St, Cushing St, First St, Putnam Ave
|
Streets and Sidewalks
|
Completed Project
|
Chapter 90 Contract 13
Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St
|
Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St
|
Streets and Sidewalks
|
Completed Project
|
Chapter 90 Contract 14
Includes Linnaean St, Spring St, Davis St, Moore St
|
Includes Linnaean St, Spring St, Davis St, Moore St
|
Streets and Sidewalks
|
Completed Project
|
Chestnut Street Reconstruction Project
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
Current Construction
|
Chetwynd Road Reconstruction Project
Chetwynd Road from Newell Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Chetwynd Road from Newell Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
City Hall AV Improvements
Upgrades to the Sullivan Chamber, Ackermann Room, and Sophie J. Anastos Room
|
Upgrades to the Sullivan Chamber, Ackermann Room, and Sophie J. Anastos Room
|
Housing
|
Completed Project
|
City Hall Annex Entry Plaza Accessibility Upgrades
City Hall Annex Entry Plaza Accessibility Upgrades anticipated to begin in March 2018.
|
City Hall Annex Entry Plaza Accessibility Upgrades anticipated to begin in March 2018.
|
Buildings
|
Completed Project
|
City Hall Facade Restoration Project
The City will soon begin a façade restoration project at City Hall. Construction is anticipated to start in fall 2023 and take approximately 15 months to complete.
|
The City will soon begin a façade restoration project at City Hall. Construction is anticipated to start in fall 2023 and take approximately 15 months to complete.
|
|
Current Construction
|
City Hall Window Restoration Project
City Hall Window Sills
|
City Hall Window Sills
|
Buildings
|
Completed Project
|
Clarendon Ave Playground
The Clarendon Avenue Playground will undergo targeted repair work and equipment upgrades to improve play conditions for and the safety of its users.
|
The Clarendon Avenue Playground will undergo targeted repair work and equipment upgrades to improve play conditions for and the safety of its users.
|
Parks
|
Completed Project
|
Common Manhole Separation Project
Includes Emily St, Tudor St, Decatur St, Speridakis Terrace, Day St, Green St, Franklin St, Hamilton St, Murray Hill Rd, Main St, Anglim St, Brewer St, Amherst Alley and the Volpe Center
|
Includes Emily St, Tudor St, Decatur St, Speridakis Terrace, Day St, Green St, Franklin St, Hamilton St, Murray Hill Rd, Main St, Anglim St, Brewer St, Amherst Alley and the Volpe Center
|
Sewer and Stormwater
|
Completed Project
|
Community Development Block Grant
Includes Elm St, Market St, Gardner Rd, Notre Dame Ave
|
Includes Elm St, Market St, Gardner Rd, Notre Dame Ave
|
Streets and Sidewalks
|
Completed Project
|
Concord Ave Reconstruction
Includes Concord Ave from Fresh Pond Parkway to Blanchard Rd.
|
Includes Concord Ave from Fresh Pond Parkway to Blanchard Rd.
|
Streets and Sidewalks
|
Completed Project
|
Concord Avenue Neighborhood
Reconstructing of utilities, streets and sidewalks in the Concord Avenue neighborhood. Phase 3 of the Alewife Sewer Separation Project.
|
Reconstructing of utilities, streets and sidewalks in the Concord Avenue neighborhood. Phase 3 of the Alewife Sewer Separation Project.
|
Sewer and Stormwater
|
Completed Project
|
Cottage and Lopez Drainage Improvements Project
The Cottage/Lopez Drainage Improvements Project includes design of new storm drain infrastructure to alleviate flooding in the Cambridgeport neighborhood.
|
The Cottage/Lopez Drainage Improvements Project includes design of new storm drain infrastructure to alleviate flooding in the Cambridgeport neighborhood.
|
Sewer and Stormwater
|
Completed Project
|
Danehy Gateway Pavilion Project
The Danehy Gateway Pavilion project, a collaboration between the Department of Public Works and the Department of Human Service Programs Recreation Division, is the construction of a new sports pavilion (5,800 sq. ft.) and other improvements to Danehy Park. Located at 100 New Street, the pavilion will serve sports teams from Cambridge Rindge and Latin School (CRLS) and the community. The facility will provide female athletes with more equitable access to amenities, including new restrooms, changing and locker rooms, an athletic trainer’s room, a coach’s office, storage for athletic equipment, and multi-purpose space. The pavilion will also provide public restrooms for park visitors.
Additionally, the project scope includes lighting improvements to Danehy Dog Park, the provision of fiber optic to enable public internet access in the park, landscape improvements, and renovation of the existing New Street Parking Lot.
The project will be net‐zero emissions (all electric) and will target LEED Gold new construction and Passive House Certification. It will include a solar photovoltaic array and provisions for future electric vehicle charging stations.
The project is currently in the design phase.
|
The Danehy Gateway Pavilion project, a collaboration between the Department of Public Works and the Department of Human Service Programs Recreation Division, is the construction of a new sports pavilion (5,800 sq. ft.) and other improvements to Danehy Park. Located at 100 New Street, the pavilion will serve sports teams from Cambridge Rindge and Latin School (CRLS) and the community. The facility will provide female athletes with more equitable access to amenities, including new restrooms, changing and locker rooms, an athletic trainer’s room, a coach’s office, storage for athletic equipment, and multi-purpose space. The pavilion will also provide public restrooms for park visitors.
Additionally, the project scope includes lighting improvements to Danehy Dog Park, the provision of fiber optic to enable public internet access in the park, landscape improvements, and renovation of the existing New Street Parking Lot.
The project will be net‐zero emissions (all electric) and will target LEED Gold new construction and Passive House Certification. It will include a solar photovoltaic array and provisions for future electric vehicle charging stations.
The project is currently in the design phase.
|
|
In Planning
|
Danehy Improvements Plan
The Danehy Improvement Plan project is a collaboration between the Department of Public Works, the Department of Human Service Programs Recreation Division, and the Community Development Department. The goal is to develop a shared vision of the future of Danehy Park that reflects the community’s needs and values. The final report will provide a roadmap that guides future park improvements for the next 10-15 years.
|
The Danehy Improvement Plan project is a collaboration between the Department of Public Works, the Department of Human Service Programs Recreation Division, and the Community Development Department. The goal is to develop a shared vision of the future of Danehy Park that reflects the community’s needs and values. The final report will provide a roadmap that guides future park improvements for the next 10-15 years.
|
Parks
|
In Planning
|
Danehy Park Environmental Monitoring and Reporting
Danehy Park is the site of a former landfill (see History section for more details). Since the landfill was capped in 1990, the management of the site is controlled by permitting through the Massachusetts Department of Environmental Protection (MassDEP), Division of Solid Waste. The goal is to ensure that the site is managed in a safe manner and that landfill gases are properly managed and allowed to vent safely. To that end, the City contracts with CDM Smith to conduct quarterly monitoring, inspect the methane trench (which is the stone-filled trench around the perimeter of the park) annually, and develop an annual environmental monitoring report that is submitted to MassDEP.
|
Danehy Park is the site of a former landfill (see History section for more details). Since the landfill was capped in 1990, the management of the site is controlled by permitting through the Massachusetts Department of Environmental Protection (MassDEP), Division of Solid Waste. The goal is to ensure that the site is managed in a safe manner and that landfill gases are properly managed and allowed to vent safely. To that end, the City contracts with CDM Smith to conduct quarterly monitoring, inspect the methane trench (which is the stone-filled trench around the perimeter of the park) annually, and develop an annual environmental monitoring report that is submitted to MassDEP.
|
|
In Progress
|
Danehy Track and Field Construction Project
The track and field, installed in 2012, are at the end of their useful life and need to be replaced. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
|
The track and field, installed in 2012, are at the end of their useful life and need to be replaced. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
|
Parks
|
Current Construction
|
Dodge Street Reconstruction Project
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan.
|
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan.
|
Streets and Sidewalks
|
In Planning
|
Drainage and Community Garden Project Page
Aimed at improving drainage along the perimeter path near the bike path entrance, as well as increasing access and improving design of the community gardens.
|
Aimed at improving drainage along the perimeter path near the bike path entrance, as well as increasing access and improving design of the community gardens.
|
Fresh Pond Reservation
|
Completed Project
|
Dudley Street Reconstruction Project
Dudley Street Reconstruction Project
|
Dudley Street Reconstruction Project
|
Streets and Sidewalks
|
Completed Project
|
Eliot Street Reconstruction Project
Eliot St., between JFK St. and Bennett St. is scheduled for reconstruction in 2019.
|
Eliot St., between JFK St. and Bennett St. is scheduled for reconstruction in 2019.
|
Streets and Sidewalks
|
Completed Project
|
Ellery Street Reconstruction Project
Reconstruction of Ellery Street between Cambridge St and Broadway
|
Reconstruction of Ellery Street between Cambridge St and Broadway
|
Streets and Sidewalks
|
Completed Project
|
Elm St Reconstruction Project
Elm St Reconstruction Project
|
Elm St Reconstruction Project
|
Streets and Sidewalks
|
Current Construction
|
Elm and Hampshire Plaza Renovation
Plaza renovation project
|
Plaza renovation project
|
Parks
|
Completed Project
|
Fairmont Rockwell Laurel Kelly Sidewalk and Street Improvements Project
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
|
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
|
Streets and Sidewalks
|
Current Construction
|
Fawcett Street
Reconstruction of Fawcett Street
|
Reconstruction of Fawcett Street
|
Streets and Sidewalks
|
Completed Project
|
Fire Department Headquarters
The City will be renovating the Fire Department Headquarters at 491 Broadway.
|
The City will be renovating the Fire Department Headquarters at 491 Broadway.
|
Buildings
|
Public Works
|
Forest Street Reconstruction Project
Includes Forest St, Frost St (Prentiss St to Forest St) and Oxford St (Garfield St to the Somerville line)
|
Includes Forest St, Frost St (Prentiss St to Forest St) and Oxford St (Garfield St to the Somerville line)
|
Streets and Sidewalks
|
Completed Project
|
Franklin St. Reconstruction Project
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018.
|
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018.
|
Streets and Sidewalks
|
Completed Project
|
Fulkerson Street Reconstruction
Cambridge Street to Charles Street
|
Cambridge Street to Charles Street
|
Streets and Sidewalks
|
Completed Project
|
Glacken Field
Glacken Field & Playground Renovation Project
|
Glacken Field & Playground Renovation Project
|
Parks
|
Public Works
|
Gore Street Utility Construction and Road Reconstruction
The City of Cambridge and Divco West, developer of NorthPoint, will be undertaking construction on Gore Street between Monsignor O’Brien Highway and Warren Street. This construction is an opportunity to incorporate improvements into Gore Street; sidewalks, crosswalks, street trees improved access to the park, etc.
|
The City of Cambridge and Divco West, developer of NorthPoint, will be undertaking construction on Gore Street between Monsignor O’Brien Highway and Warren Street. This construction is an opportunity to incorporate improvements into Gore Street; sidewalks, crosswalks, street trees improved access to the park, etc.
|
Sewer and Stormwater
|
Completed Project
|
Graham and Parks School Improvements
Building & Park Improvements
|
Building & Park Improvements
|
Buildings
|
Completed Project
|
Gray Street Reconstruction Project
Gray Street from Martin Street to Linnaean Street is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Gray Street from Martin Street to Linnaean Street is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Green Line Extension Project
The Green Line Extension is a top transportation priority of the Commonwealth.
|
The Green Line Extension is a top transportation priority of the Commonwealth.
|
Transit
|
Completed Project
|
Green Street Reconstruction Project
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
Current Construction
|
Haggerty School Playground
Reconstruction of the Haggerty School Playground
|
Reconstruction of the Haggerty School Playground
|
Parks
|
Completed Project
|
Harvard Square Improvements 2015
Mt. Auburn Street from JFK Street to Holyoke Street
|
Mt. Auburn Street from JFK Street to Holyoke Street
|
Streets and Sidewalks
|
Completed Project
|
Harvard Square Improvements Project
Includes Linden, Pympton, Dunster, and JFK St
|
Includes Linden, Pympton, Dunster, and JFK St
|
Streets and Sidewalks
|
Completed Project
|
Harvard Square Kiosk and Plaza
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza.
|
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza.
|
Streets and Sidewalks
|
Public Works
|
Harvard Square MBTA Elevator Project/DeGuglielmo Plaza
MBTA Elevator Construction and DeGuglielmo Plaza Reconstruction.
|
MBTA Elevator Construction and DeGuglielmo Plaza Reconstruction.
|
|
Completed Project
|
Harvard Square Public Toilet
Installation of Public Toilet in Harvard Square
|
Installation of Public Toilet in Harvard Square
|
Parks
|
Completed Project
|
Harvey Street Traffic Calming
The Community Development Department (CDD) has received several requests for traffic calming measures on Harvey Street.
|
The Community Development Department (CDD) has received several requests for traffic calming measures on Harvey Street.
|
Traffic Calming
|
Completed Project
|
Haskell Street Reconstruction Project
Haskell Street from Rindge Ave to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Haskell Street from Rindge Ave to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Hayes Street Reconstruction
Roadway and Sidewalks
|
Roadway and Sidewalks
|
Streets and Sidewalks
|
Completed Project
|
Highland St Reconstruction Project
Highland St, between Appleton Street and Sparks Street, is scheduled for street and sidewalk reconstruction in 2018.
|
Highland St, between Appleton Street and Sparks Street, is scheduled for street and sidewalk reconstruction in 2018.
|
Streets and Sidewalks
|
Completed Project
|
Hurlbut Street Reconstruction
Sidewalks & Roadway
|
Sidewalks & Roadway
|
Streets and Sidewalks
|
Completed Project
|
Hurley Street Park Renovation
Hurley Street Park Renovation
|
Hurley Street Park Renovation
|
Parks
|
Completed Project
|
Huron A Improvements
Phase 1 of the Alewife Brook Sewer Separation Project.
|
Phase 1 of the Alewife Brook Sewer Separation Project.
|
Sewer and Stormwater
|
Completed Project
|
Huron Ave Reconstruction Project
Huron Ave, between Concord Ave. and Raymond St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Huron Ave, between Concord Ave. and Raymond St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Streets and Sidewalks
|
Completed Project
|
Huron Ave and Cushing Plaza Improvements Project
As part of the Five-Year Street and Sidewalk Reconstruction Plan, Huron Ave, from Fresh Pond Place to Fresh Pond Parkway, is scheduled for reconstruction. This project will include paving, sidewalk improvements and utility installations.
Cushing Plaza, located at Cushing Street and Huron Avenue, is scheduled for reconstruction to allow stormwater to infiltrate and provide enhanced biochar and compost soil for the new trees and garden plantings.
|
As part of the Five-Year Street and Sidewalk Reconstruction Plan, Huron Ave, from Fresh Pond Place to Fresh Pond Parkway, is scheduled for reconstruction. This project will include paving, sidewalk improvements and utility installations.
Cushing Plaza, located at Cushing Street and Huron Avenue, is scheduled for reconstruction to allow stormwater to infiltrate and provide enhanced biochar and compost soil for the new trees and garden plantings.
|
|
Current Construction
|
Huron B Improvements
Phase 2 of the Alewife Brook Sewer Separation Project.
|
Phase 2 of the Alewife Brook Sewer Separation Project.
|
Sewer and Stormwater
|
Completed Project
|
Inman Square
Inman Square Intersection Improvements
|
Inman Square Intersection Improvements
|
Traffic Calming
|
Current Construction
|
Irving Street and Scott Street
Reconstruction of Irving Street & Scott Street
|
Reconstruction of Irving Street & Scott Street
|
Streets and Sidewalks
|
Completed Project
|
Kenwood Street
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Streets and Sidewalks
|
Completed Project
|
King Open and Cambridge Street Upper Schools & Community Complex Project
King Open and Cambridge Street Upper Schools & Community Complex Project
|
King Open and Cambridge Street Upper Schools & Community Complex Project
|
City Managers Office
|
Completed Project
|
Kinnaird Street Reconstruction
Reconstruction of Kinnaird Street
|
Reconstruction of Kinnaird Street
|
Streets and Sidewalks
|
Completed Project
|
Kirkland Road Reconstruction Project
Kirkland Road from Kirkland Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Kirkland Road from Kirkland Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Land Boulevard Infrastructure Improvements Project
Infrastructure Improvement Project on Land Boulevard at Binney Street
|
Infrastructure Improvement Project on Land Boulevard at Binney Street
|
Sewer and Stormwater
|
Completed Project
|
Lawn St Reconstruction
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Streets and Sidewalks
|
Completed Project
|
Longfellow Road
Reconstruction of Longfellow Road
|
Reconstruction of Longfellow Road
|
Streets and Sidewalks
|
Completed Project
|
Main Street Reconstruction Project
Reconstruction of Main Street in Kendall Square
|
Reconstruction of Main Street in Kendall Square
|
Streets and Sidewalks
|
Completed Project
|
Maple Ave Reconstruction Project
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
In Planning
|
Mass Ave Improvements - Harvard Square
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Plymton to Garden.
|
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Plymton to Garden.
|
Streets and Sidewalks
|
Public Works
|
Mass Ave Partial Construction
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Dudley to Beech and Roseland to Waterhouse.
|
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Dudley to Beech and Roseland to Waterhouse.
|
Streets and Sidewalks
|
In Planning
|
Massachusetts Ave Reconstruction Project
Linnaean St to Upland Rd
|
Linnaean St to Upland Rd
|
Streets and Sidewalks
|
Completed Project
|
Massachusetts Avenue Reconstruction
Everett Street to Linnaean Street & Beech Street to Russell Street
|
Everett Street to Linnaean Street & Beech Street to Russell Street
|
Streets and Sidewalks
|
Completed Project
|
Meacham Woodbridge Shea Locke
Street/ sidewalk reconstruction on Meacham Road, Woodbridge Street, Shea Road, Locke Street.
|
Street/ sidewalk reconstruction on Meacham Road, Woodbridge Street, Shea Road, Locke Street.
|
Streets and Sidewalks
|
Completed Project
|
Mead Street Reconstruction
Reconstruction of Mead Street
|
Reconstruction of Mead Street
|
Streets and Sidewalks
|
Completed Project
|
Monsignor O'Brien Highway Reconstruction - Phase 2A (Lechmere Canal Outfall)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
|
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
|
Streets and Sidewalks
|
Completed Project
|
Monsignor O'Brien Hwy Reconstruction - Phase 1 (Third St. to Gore St.)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
|
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
|
Streets and Sidewalks
|
Completed Project
|
Montgomery Street Reconstruction Project
Montgomery Street between Harvey St. and Rindge Ave. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Montgomery Street between Harvey St. and Rindge Ave. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
In Planning
|
Mt. Auburn Street Reconstruction
Gibson Street to Fresh Pond Parkway
|
Gibson Street to Fresh Pond Parkway
|
Streets and Sidewalks
|
Completed Project
|
Myrtle/Magnolia Ave Project
Includes Myrtle Ave, Magnolia Ave, Hovey Ave, Lamont Ave
|
Includes Myrtle Ave, Magnolia Ave, Hovey Ave, Lamont Ave
|
Sewer and Stormwater
|
Completed Project
|
New Street Infrastructure and Streetscape Improvements and Concord Lane Sewer Separation Project
New St from Bay State Rd to the railroad tracks and Concord Lane
|
New St from Bay State Rd to the railroad tracks and Concord Lane
|
Streets and Sidewalks
|
Completed Project
|
Newport Road and Roseland Street Infrastructure Improvements
Newport Road and Roseland Street Infrastructure Improvements
|
Newport Road and Roseland Street Infrastructure Improvements
|
Sewer and Stormwater
|
Completed Project
|
Norfolk Street Reconstruction Project
Norfolk Street from Broadway to the Somerville line is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Norfolk Street from Broadway to the Somerville line is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
O'Connell Library Pocket Park
Construction of a small park in the front and on the sides of O'Connell Library.
|
Construction of a small park in the front and on the sides of O'Connell Library.
|
Parks
|
Completed Project
|
Pacific Street Dog Park
Improvements to the Pacific Street Dog Park.
|
Improvements to the Pacific Street Dog Park.
|
Parks
|
Completed Project
|
Park Ave Road Reconstruction Project
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020.
|
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020.
|
Streets and Sidewalks
|
Current Construction
|
Parker and Healey Streets
Road and Sidewalk Reconstruction
|
Road and Sidewalk Reconstruction
|
Streets and Sidewalks
|
Completed Project
|
Pearl Street Reconstruction Project
Reconstruction of Pearl Street from Massachusetts Avenue to Granite St.
|
Reconstruction of Pearl Street from Massachusetts Avenue to Granite St.
|
Streets and Sidewalks
|
Completed Project
|
Pemberton Street Court Renovation
Resurfacing of Tennis Courts and Basketball Courts
|
Resurfacing of Tennis Courts and Basketball Courts
|
Parks
|
Completed Project
|
Pleasant Street intersection at Fairmont Street Reconstruction
Pleasant Street/Fairmont Street Intersection
|
Pleasant Street/Fairmont Street Intersection
|
Streets and Sidewalks
|
Completed Project
|
Porter/Harding Streets
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Streets and Sidewalks
|
Completed Project
|
Prentiss Street Reconstruction
Includes Massachusetts Ave to the Somerville Line, Oxford St from Garfield to Forest (sewer only)
|
Includes Massachusetts Ave to the Somerville Line, Oxford St from Garfield to Forest (sewer only)
|
Sewer and Stormwater
|
Completed Project
|
Richard Ave and Muller Ave
Roadway & Sidewalk Reconstruction
|
Roadway & Sidewalk Reconstruction
|
Streets and Sidewalks
|
Completed Project
|
River Street Reconstruction Project
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project.
The project includes utility and surface reconstruction of the following streets and public spaces:
• River Street from Memorial Drive to Massachusetts Avenue
• Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square)
• The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza
• Pleasant Street and Tubman Square between Pleasant Place and River Street
• Green Street between Magazine and Pearl Street
• Magazine Street between Franklin and Green Street
• Blackstone Street
In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan
• Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
|
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project.
The project includes utility and surface reconstruction of the following streets and public spaces:
• River Street from Memorial Drive to Massachusetts Avenue
• Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square)
• The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza
• Pleasant Street and Tubman Square between Pleasant Place and River Street
• Green Street between Magazine and Pearl Street
• Magazine Street between Franklin and Green Street
• Blackstone Street
In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan
• Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
|
Streets and Sidewalks
|
Current Construction
|
Route 2 / Route 16 intersection
MassDOT project - scheduled to be completed Spring 2016
|
MassDOT project - scheduled to be completed Spring 2016
|
Streets and Sidewalks
|
Completed Project
|
Russell Field Path Maintenance Improvement Project
The City of Cambridge and MBTA have been working together to develop a maintenance improvement project to address the issues on the Russell Field Path which is owned and maintained by the MBTA.
|
The City of Cambridge and MBTA have been working together to develop a maintenance improvement project to address the issues on the Russell Field Path which is owned and maintained by the MBTA.
|
Multi-Use Path
|
Completed Project
|
Russell Field Renovation Project
The City is developing plans to renovate Russell Field and the adjacent practice field area. Plans include the resurfacing of both playing fields and site amenities to improve the functionality of the facility.
|
The City is developing plans to renovate Russell Field and the adjacent practice field area. Plans include the resurfacing of both playing fields and site amenities to improve the functionality of the facility.
|
Parks
|
Completed Project
|
Sacramento Field Improvements
Park renovation and improvements
|
Park renovation and improvements
|
Parks
|
Completed Project
|
Sciarappa St Reconstruction Project
Sciarappa Street from Charles St. to Winter St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Sciarappa Street from Charles St. to Winter St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
In Planning
|
Second Street Reconstruction
Rogers Street to Charles Street & Hurley Street to Gore Street
|
Rogers Street to Charles Street & Hurley Street to Gore Street
|
Streets and Sidewalks
|
Completed Project
|
Sennott Park Renovation Project
The City is planning to make repairs and modest improvements to Sennott Park. Construction is anticipated to begin late Summer 2021
|
The City is planning to make repairs and modest improvements to Sennott Park. Construction is anticipated to begin late Summer 2021
|
Parks
|
Completed Project
|
Sewer Cleaning and Lining
The City's contractor, National Water Main, is performing "cured-in-place" pipelining around the City. this process provides a new, jointless sewer pipe connection that minimizes root and water infiltration problems, improves flow and provides for a more structurally sound pipe without the need for excavation.
|
The City's contractor, National Water Main, is performing "cured-in-place" pipelining around the City. this process provides a new, jointless sewer pipe connection that minimizes root and water infiltration problems, improves flow and provides for a more structurally sound pipe without the need for excavation.
|
Sewer and Stormwater
|
Public Works
|
Shepard Street Reconstruction Project
Shepard Street from Garden Street to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Shepard Street from Garden Street to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Sherman Street Drainage Improvements
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments.
|
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments.
|
Sewer and Stormwater
|
Completed Project
|
Sherman Street Reconstruction
Garden Street to Walden Street
|
Garden Street to Walden Street
|
Streets and Sidewalks
|
Completed Project
|
Simard Building Reconstruction Project
The Simard building, located at the Department of Public Works campus, 147 Hampshire St., is slated for renovations.
|
The Simard building, located at the Department of Public Works campus, 147 Hampshire St., is slated for renovations.
|
Buildings
|
Public Works
|
Sixth Street Reconstruction Project
Sixth Street between Cambridge Street and Bent Street is currently scheduled for roadway work in the summer of 2018 as part of the City's 5 Year Street & Sidewalk Plan.
|
Sixth Street between Cambridge Street and Bent Street is currently scheduled for roadway work in the summer of 2018 as part of the City's 5 Year Street & Sidewalk Plan.
|
Streets and Sidewalks
|
Completed Project
|
St Mary Road Reconstruction Project
St. Mary Road, between Inman Street and Prospect Street, is scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
|
St. Mary Road, between Inman Street and Prospect Street, is scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
|
Streets and Sidewalks
|
Completed Project
|
Talbot Street Outfall
MIT in collaboration with the City of Cambridge is planning to install a new drainage structure from Talbot Street to the Charles River to improve stormwater management in the area due to current and future development. The project will begin construction in October of this year and continue through to the Fall of 2019.
|
MIT in collaboration with the City of Cambridge is planning to install a new drainage structure from Talbot Street to the Charles River to improve stormwater management in the area due to current and future development. The project will begin construction in October of this year and continue through to the Fall of 2019.
|
Sewer and Stormwater
|
Completed Project
|
Taylor Square Fire Station Improvement Project
Beginning Spring 2019 and lasting for approximately 12 months, several improvements will be taking place at the Taylor Square Fire Station. Work will be taking place on the interior and exterior of the building. See below for project updates, timeline and additional info.
|
Beginning Spring 2019 and lasting for approximately 12 months, several improvements will be taking place at the Taylor Square Fire Station. Work will be taking place on the interior and exterior of the building. See below for project updates, timeline and additional info.
|
Buildings
|
Completed Project
|
The Martin Luther King Jr. School Construction Project
MLK School Construction Project
|
MLK School Construction Project
|
City Managers Office
|
Completed Project
|
The Port Infrastructure Improvements Project
Construction of water, sewer, drainage, street and sidewalk improvements in The Port
|
Construction of water, sewer, drainage, street and sidewalk improvements in The Port
|
Sewer and Stormwater
|
Current Construction
|
Thorndike Street Reconstruction Project
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement.
|
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement.
|
Streets and Sidewalks
|
Completed Project
|
Timothy J. Toomey, Jr. Park
Formerly known as Rogers St. Park, this new City park is being constructed at 71 Rogers St.
|
Formerly known as Rogers St. Park, this new City park is being constructed at 71 Rogers St.
|
Parks
|
Completed Project
|
Tobin Montessori & Vassal Lane Upper Schools Project
The Cambridge Public Schools’ Innovation Agenda will result in the creation of four new upper school campuses serving students in grades 6 to 8. The Tobin and Vassal Lane Upper Schools, located at 197 Vassal Lane, Cambridge, will be the third school to be redesigned.
|
The Cambridge Public Schools’ Innovation Agenda will result in the creation of four new upper school campuses serving students in grades 6 to 8. The Tobin and Vassal Lane Upper Schools, located at 197 Vassal Lane, Cambridge, will be the third school to be redesigned.
|
City Managers Office
|
Current Construction
|
Tremont Street Raised Intersection
Traffic Calming at Tremont/Gardner
|
Traffic Calming at Tremont/Gardner
|
Traffic Calming
|
Completed Project
|
Tufts Street Reconstruction
Magazine Street to Pearl Street
|
Magazine Street to Pearl Street
|
Streets and Sidewalks
|
Completed Project
|
Updated Combined Sewer Overflow (CSO) Control Plan
The City of Cambridge, the City of Somerville, and the Massachusetts Water Resources Authority are collaborating on CSO Control plans to protect and improve our water resources.
|
The City of Cambridge, the City of Somerville, and the Massachusetts Water Resources Authority are collaborating on CSO Control plans to protect and improve our water resources.
|
Sewer and Stormwater
|
Public Works
|
War Memorial Tennis Courts Resurfacing and Drainage Project
The CRLS Tennis Courts will be under construction from late July to early September
|
The CRLS Tennis Courts will be under construction from late July to early September
|
Parks
|
Completed Project
|
Waterhouse Street
Street/ sidewalk reconstruction on Waterhouse Street.
|
Street/ sidewalk reconstruction on Waterhouse Street.
|
Streets and Sidewalks
|
Completed Project
|
Webster Avenue
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Streets and Sidewalks
|
Current Construction
|
Western Ave Reconstruction Project
Includes Western Ave from Green St. to Memorial Dr.
|
Includes Western Ave from Green St. to Memorial Dr.
|
Streets and Sidewalks
|
Completed Project
|
Willard Street Drainage Improvement Project
The main goal of the Willard Street Drainage Improvement Project is to address stormwater flooding of the street and abutting properties. The project also provides an opportunity to upgrade other obsolete utilities and provide surface improvements including accessible sidewalks and traffic calming.
|
The main goal of the Willard Street Drainage Improvement Project is to address stormwater flooding of the street and abutting properties. The project also provides an opportunity to upgrade other obsolete utilities and provide surface improvements including accessible sidewalks and traffic calming.
|
Sewer and Stormwater
|
Current Construction
|