City Construction Projects

Complete Streets Approach

The City of Cambridge is committed to improving the roadways, sidewalk and utilities to make them safe for all users. The construction season in Cambridge runs from mid-April through November, weather permitting. Work may be done outside of the official construction season if it doesn’t interfere with snow removal. To learn more about how City streets are prioritized for reconstruction, please visit the 5 Year Sidewalk and Street Reconstruction Plan

  • City Construction Projects- For detailed information about City construction projects, see below. You can filter for projects In Planning, In Construction or Completed. These construction projects may also be viewed as a map. You can sign up to receive email updates for any of the projects by going to the “Contact” tab of the project page.
  • University Construction Projects- Harvard University Construction information can be found here, MIT Construction Information can be found here
  • Utility Construction and Private Development Projects- For all other construction updates, including work being done by the Cambridge Water Department, Cambridge Electric Department, Eversource, other utility companies and large private development projects, click here.

Filter  
Close  
Displaying 1-136 of 136 results
Project Name & Description Description Type Status
859 Massachusetts Ave Project
The City of Cambridge has purchased the building located at 859 Massachusetts Avenue formerly owned by the Chamber of Commerce. The City has decided to move the family shelter, formerly located at 3 Bigelow Street, into this location.
The City of Cambridge has purchased the building located at 859 Massachusetts Avenue formerly owned by the Chamber of Commerce. The City has decided to move the family shelter, formerly located at 3 Bigelow Street, into this location. City Managers Office Completed Project
Alewife Linear Park Restoration Project
There are several opportunities for tree canopy development in Alewife Linear Park
There are several opportunities for tree canopy development in Alewife Linear Park Parks In Planning
Amory Street Reconstruction
Reconstruction of Amory Street
Reconstruction of Amory Street Streets and Sidewalks Completed Project
Appleton Street Infrastructure Improvements Project
Highland Street to Brattle Street
Highland Street to Brattle Street Sewer and Stormwater Completed Project
Belmont Street Reconstruction Project
Belmont Street Reconstruction Project
Belmont Street Reconstruction Project Streets and Sidewalks Current Construction
Binney Street Park
Binney Street Park, located between Binney Street and Broadway along Galileo Galilei Way, is one of three new City open spaces in eastern Cambridge. The design of the park was guided by the Eastern Cambridge/Kendall Square Open Space (ECKOS) Study and Connect Kendall Square Open Space Competition, which resulted in a framework plan for the overall network of open spaces in eastern Cambridge. This new park will feature a variety of tree plantings, a dog run, lounge and play surfaces, and will include a segment of the Grand Junction Greenway.
Binney Street Park, located between Binney Street and Broadway along Galileo Galilei Way, is one of three new City open spaces in eastern Cambridge. The design of the park was guided by the Eastern Cambridge/Kendall Square Open Space (ECKOS) Study and Connect Kendall Square Open Space Competition, which resulted in a framework plan for the overall network of open spaces in eastern Cambridge. This new park will feature a variety of tree plantings, a dog run, lounge and play surfaces, and will include a segment of the Grand Junction Greenway. Parks Current Construction
Binney Street Stormwater Utility Improvements Construction Project
The City of Cambridge and DivcoWest, the developer of NorthPoint, will be implementing storm water infrastructure improvements on Binney Street. The new drainage system will be installed in Binney Street from Cardinal Medeiros Avenue to the area west of Galileo Galilei Way, through the park area to Broadway. The system will be owned and maintained by the City of Cambridge.
The City of Cambridge and DivcoWest, the developer of NorthPoint, will be implementing storm water infrastructure improvements on Binney Street. The new drainage system will be installed in Binney Street from Cardinal Medeiros Avenue to the area west of Galileo Galilei Way, through the park area to Broadway. The system will be owned and maintained by the City of Cambridge. Sewer and Stormwater Completed Project
Brewster/Riedesel Reconstruction Project
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan. Streets and Sidewalks Completed Project
Broadway Improvements
Third Street to Ames Street
Third Street to Ames Street Streets and Sidewalks Completed Project
Broadway Reconstruction Project
Prospect Street to Portland Street
Prospect Street to Portland Street Streets and Sidewalks Completed Project
Brookline Street Reconstruction
Brookline Street Improvements (from Henry to Pacific)
Brookline Street Improvements (from Henry to Pacific) Streets and Sidewalks Completed Project
CAM400 Infrastructure Improvement Project
Includes Whittemore Ave, Harrison Ave, Seagrave Rd, Madison Ave, Magoun St, Columbus Ave, Kimball St, Kassul Pk, and Massachusetts Ave and Alewife Brook Pkwy Intersection
Includes Whittemore Ave, Harrison Ave, Seagrave Rd, Madison Ave, Magoun St, Columbus Ave, Kimball St, Kassul Pk, and Massachusetts Ave and Alewife Brook Pkwy Intersection Sewer and Stormwater Completed Project
Cambridge Common and Flagstaff Park
Rehabilitation of the Cambridge Common and Flagstaff Park
Rehabilitation of the Cambridge Common and Flagstaff Park Parks Completed Project
Cambridge Park Drive Area Drainage Improvements and Stormwater Wetland Project
Includes Wheeler St, Fawcett St, CambridgePark Dr, Acorn Park Dr, and the Alewife Reservation
Includes Wheeler St, Fawcett St, CambridgePark Dr, Acorn Park Dr, and the Alewife Reservation Sewer and Stormwater Completed Project
Cambridge Tunnel Reconstruction Project
Reconstruction of the Cambridge Tunnel and Overpass
Reconstruction of the Cambridge Tunnel and Overpass Streets and Sidewalks Completed Project
Central Square Public Toilet
As part of the City’s Participatory Budgeting process, $320,000 in the Fiscal Year 2016 Budget was allocated for a public toilet installation in Central Square.
As part of the City’s Participatory Budgeting process, $320,000 in the Fiscal Year 2016 Budget was allocated for a public toilet installation in Central Square. Streets and Sidewalks Completed Project
Centre Street and Dana Street Reconstruction Projects
Centre Street from Dana St. to Hancock St. and Dana Street from Cambridge Street to Mass Ave are scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Centre Street from Dana St. to Hancock St. and Dana Street from Cambridge Street to Mass Ave are scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Public Works
Chapter 90 Contract 11
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2 Streets and Sidewalks Completed Project
Chapter 90 Contract 12
Includes Hubbard Ave, Robinson St, Cushing St, First St, Putnam Ave
Includes Hubbard Ave, Robinson St, Cushing St, First St, Putnam Ave Streets and Sidewalks Completed Project
Chapter 90 Contract 13
Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St
Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St Streets and Sidewalks Completed Project
Chapter 90 Contract 14
Includes Linnaean St, Spring St, Davis St, Moore St
Includes Linnaean St, Spring St, Davis St, Moore St Streets and Sidewalks Completed Project
Chestnut Street Reconstruction Project
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Current Construction
Chetwynd Road Reconstruction Project
Chetwynd Road from Newell Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
Chetwynd Road from Newell Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
City Hall AV Improvements
Upgrades to the Sullivan Chamber, Ackermann Room, and Sophie J. Anastos Room
Upgrades to the Sullivan Chamber, Ackermann Room, and Sophie J. Anastos Room Housing Completed Project
City Hall Annex Entry Plaza Accessibility Upgrades
City Hall Annex Entry Plaza Accessibility Upgrades anticipated to begin in March 2018.
City Hall Annex Entry Plaza Accessibility Upgrades anticipated to begin in March 2018. Buildings Completed Project
City Hall Facade Restoration Project
The City will soon begin a façade restoration project at City Hall. Construction is anticipated to start in fall 2023 and take approximately 15 months to complete.
The City will soon begin a façade restoration project at City Hall. Construction is anticipated to start in fall 2023 and take approximately 15 months to complete. Current Construction
City Hall Window Restoration Project
City Hall Window Sills
City Hall Window Sills Buildings Completed Project
Clarendon Ave Playground
The Clarendon Avenue Playground will undergo targeted repair work and equipment upgrades to improve play conditions for and the safety of its users.
The Clarendon Avenue Playground will undergo targeted repair work and equipment upgrades to improve play conditions for and the safety of its users. Parks Completed Project
Common Manhole Separation Project
Includes Emily St, Tudor St, Decatur St, Speridakis Terrace, Day St, Green St, Franklin St, Hamilton St, Murray Hill Rd, Main St, Anglim St, Brewer St, Amherst Alley and the Volpe Center
Includes Emily St, Tudor St, Decatur St, Speridakis Terrace, Day St, Green St, Franklin St, Hamilton St, Murray Hill Rd, Main St, Anglim St, Brewer St, Amherst Alley and the Volpe Center Sewer and Stormwater Completed Project
Community Development Block Grant
Includes Elm St, Market St, Gardner Rd, Notre Dame Ave
Includes Elm St, Market St, Gardner Rd, Notre Dame Ave Streets and Sidewalks Completed Project
Concord Ave Reconstruction
Includes Concord Ave from Fresh Pond Parkway to Blanchard Rd.
Includes Concord Ave from Fresh Pond Parkway to Blanchard Rd. Streets and Sidewalks Completed Project
Concord Avenue Neighborhood
Reconstructing of utilities, streets and sidewalks in the Concord Avenue neighborhood. Phase 3 of the Alewife Sewer Separation Project.
Reconstructing of utilities, streets and sidewalks in the Concord Avenue neighborhood. Phase 3 of the Alewife Sewer Separation Project. Sewer and Stormwater Completed Project
Cottage and Lopez Drainage Improvements Project
The Cottage/Lopez Drainage Improvements Project includes design of new storm drain infrastructure to alleviate flooding in the Cambridgeport neighborhood.
The Cottage/Lopez Drainage Improvements Project includes design of new storm drain infrastructure to alleviate flooding in the Cambridgeport neighborhood. Sewer and Stormwater Completed Project
Danehy Gateway Pavilion Project
The Danehy Gateway Pavilion project, a collaboration between the Department of Public Works and the Department of Human Service Programs Recreation Division, is the construction of a new sports pavilion (5,800 sq. ft.) and other improvements to Danehy Park. Located at 100 New Street, the pavilion will serve sports teams from Cambridge Rindge and Latin School (CRLS) and the community. The facility will provide female athletes with more equitable access to amenities, including new restrooms, changing and locker rooms, an athletic trainer’s room, a coach’s office, storage for athletic equipment, and multi-purpose space. The pavilion will also provide public restrooms for park visitors. Additionally, the project scope includes lighting improvements to Danehy Dog Park, the provision of fiber optic to enable public internet access in the park, landscape improvements, and renovation of the existing New Street Parking Lot. The project will be net‐zero emissions (all electric) and will target LEED Gold new construction and Passive House Certification. It will include a solar photovoltaic array and provisions for future electric vehicle charging stations. The project is currently in the design phase.
The Danehy Gateway Pavilion project, a collaboration between the Department of Public Works and the Department of Human Service Programs Recreation Division, is the construction of a new sports pavilion (5,800 sq. ft.) and other improvements to Danehy Park. Located at 100 New Street, the pavilion will serve sports teams from Cambridge Rindge and Latin School (CRLS) and the community. The facility will provide female athletes with more equitable access to amenities, including new restrooms, changing and locker rooms, an athletic trainer’s room, a coach’s office, storage for athletic equipment, and multi-purpose space. The pavilion will also provide public restrooms for park visitors. Additionally, the project scope includes lighting improvements to Danehy Dog Park, the provision of fiber optic to enable public internet access in the park, landscape improvements, and renovation of the existing New Street Parking Lot. The project will be net‐zero emissions (all electric) and will target LEED Gold new construction and Passive House Certification. It will include a solar photovoltaic array and provisions for future electric vehicle charging stations. The project is currently in the design phase. In Planning
Danehy Improvements Plan
The Danehy Improvement Plan project is a collaboration between the Department of Public Works, the Department of Human Service Programs Recreation Division, and the Community Development Department. The goal is to develop a shared vision of the future of Danehy Park that reflects the community’s needs and values. The final report will provide a roadmap that guides future park improvements for the next 10-15 years.
The Danehy Improvement Plan project is a collaboration between the Department of Public Works, the Department of Human Service Programs Recreation Division, and the Community Development Department. The goal is to develop a shared vision of the future of Danehy Park that reflects the community’s needs and values. The final report will provide a roadmap that guides future park improvements for the next 10-15 years. Parks In Planning
Danehy Park Environmental Monitoring and Reporting
Danehy Park is the site of a former landfill (see History section for more details). Since the landfill was capped in 1990, the management of the site is controlled by permitting through the Massachusetts Department of Environmental Protection (MassDEP), Division of Solid Waste.  The goal is to ensure that the site is managed in a safe manner and that landfill gases are properly managed and allowed to vent safely.  To that end, the City contracts with CDM Smith to conduct quarterly monitoring, inspect the methane trench (which is the stone-filled trench around the perimeter of the park) annually, and develop an annual environmental monitoring report that is submitted to MassDEP. 
Danehy Park is the site of a former landfill (see History section for more details). Since the landfill was capped in 1990, the management of the site is controlled by permitting through the Massachusetts Department of Environmental Protection (MassDEP), Division of Solid Waste.  The goal is to ensure that the site is managed in a safe manner and that landfill gases are properly managed and allowed to vent safely.  To that end, the City contracts with CDM Smith to conduct quarterly monitoring, inspect the methane trench (which is the stone-filled trench around the perimeter of the park) annually, and develop an annual environmental monitoring report that is submitted to MassDEP.  In Progress
Dodge Street Reconstruction Project
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan.
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan. Streets and Sidewalks In Planning
Drainage and Community Garden Project Page
Aimed at improving drainage along the perimeter path near the bike path entrance, as well as increasing access and improving design of the community gardens.
Aimed at improving drainage along the perimeter path near the bike path entrance, as well as increasing access and improving design of the community gardens. Fresh Pond Reservation Completed Project
Dudley Street Reconstruction Project
Dudley Street Reconstruction Project
Dudley Street Reconstruction Project Streets and Sidewalks Completed Project
Eliot Street Reconstruction Project
Eliot St., between JFK St. and Bennett St. is scheduled for reconstruction in 2019.
Eliot St., between JFK St. and Bennett St. is scheduled for reconstruction in 2019. Streets and Sidewalks Completed Project
Ellery Street Reconstruction Project
Reconstruction of Ellery Street between Cambridge St and Broadway
Reconstruction of Ellery Street between Cambridge St and Broadway Streets and Sidewalks Completed Project
Elm St Reconstruction Project
Elm St Reconstruction Project
Elm St Reconstruction Project Streets and Sidewalks In Planning
Elm and Hampshire Plaza Renovation
Plaza renovation project
Plaza renovation project Parks Completed Project
Fairmont Rockwell Laurel Kelly Sidewalk and Street Improvements Project
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd. Streets and Sidewalks Current Construction
Fawcett Street
Reconstruction of Fawcett Street
Reconstruction of Fawcett Street Streets and Sidewalks Completed Project
Fire Department Headquarters
The City will be renovating the Fire Department Headquarters at 491 Broadway.
The City will be renovating the Fire Department Headquarters at 491 Broadway. Buildings Public Works
Forest Street Reconstruction Project
Includes Forest St, Frost St (Prentiss St to Forest St) and Oxford St (Garfield St to the Somerville line)
Includes Forest St, Frost St (Prentiss St to Forest St) and Oxford St (Garfield St to the Somerville line) Streets and Sidewalks Completed Project
Franklin St. Reconstruction Project
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018.
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018. Streets and Sidewalks Current Construction
Fulkerson Street Reconstruction
Cambridge Street to Charles Street
Cambridge Street to Charles Street Streets and Sidewalks Completed Project
Glacken Field
Glacken Field & Playground Renovation Project
Glacken Field & Playground Renovation Project Parks Public Works
Gore Street Utility Construction and Road Reconstruction
The City of Cambridge and Divco West, developer of NorthPoint, will be undertaking construction on Gore Street between Monsignor O’Brien Highway and Warren Street. This construction is an opportunity to incorporate improvements into Gore Street; sidewalks, crosswalks, street trees improved access to the park, etc.
The City of Cambridge and Divco West, developer of NorthPoint, will be undertaking construction on Gore Street between Monsignor O’Brien Highway and Warren Street. This construction is an opportunity to incorporate improvements into Gore Street; sidewalks, crosswalks, street trees improved access to the park, etc. Sewer and Stormwater Current Construction
Graham and Parks School Improvements
Building & Park Improvements
Building & Park Improvements Buildings Current Construction
Gray Street Reconstruction Project
Gray Street from Martin Street to Linnaean Street is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
Gray Street from Martin Street to Linnaean Street is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Green Line Extension Project
The Green Line Extension is a top transportation priority of the Commonwealth.
The Green Line Extension is a top transportation priority of the Commonwealth. Transit Current Construction
Green Street Reconstruction Project
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Public Works
Haggerty School Playground
Reconstruction of the Haggerty School Playground
Reconstruction of the Haggerty School Playground Parks Completed Project
Harvard Square Improvements 2015
Mt. Auburn Street from JFK Street to Holyoke Street
Mt. Auburn Street from JFK Street to Holyoke Street Streets and Sidewalks Completed Project
Harvard Square Improvements Project
Includes Linden, Pympton, Dunster, and JFK St
Includes Linden, Pympton, Dunster, and JFK St Streets and Sidewalks Completed Project
Harvard Square Kiosk and Plaza
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza.
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza. Streets and Sidewalks Public Works
Harvard Square MBTA Elevator Project/DeGuglielmo Plaza
MBTA Elevator Construction and DeGuglielmo Plaza Reconstruction.
MBTA Elevator Construction and DeGuglielmo Plaza Reconstruction. Completed Project
Harvard Square Public Toilet
Installation of Public Toilet in Harvard Square
Installation of Public Toilet in Harvard Square Parks Completed Project
Harvey Street Traffic Calming
The Community Development Department (CDD) has received several requests for traffic calming measures on Harvey Street.
The Community Development Department (CDD) has received several requests for traffic calming measures on Harvey Street. Traffic Calming Completed Project
Haskell Street Reconstruction Project
Haskell Street from Rindge Ave to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
Haskell Street from Rindge Ave to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Hayes Street Reconstruction
Roadway and Sidewalks
Roadway and Sidewalks Streets and Sidewalks Completed Project
Highland St Reconstruction Project
Highland St, between Appleton Street and Sparks Street, is scheduled for street and sidewalk reconstruction in 2018.
Highland St, between Appleton Street and Sparks Street, is scheduled for street and sidewalk reconstruction in 2018. Streets and Sidewalks Completed Project
Hurlbut Street Reconstruction
Sidewalks & Roadway
Sidewalks & Roadway Streets and Sidewalks Completed Project
Hurley Street Park Renovation
Hurley Street Park Renovation
Hurley Street Park Renovation Parks Completed Project
Huron A Improvements
Phase 1 of the Alewife Brook Sewer Separation Project.
Phase 1 of the Alewife Brook Sewer Separation Project. Sewer and Stormwater Completed Project
Huron Ave Reconstruction Project
Huron Ave, between Concord Ave. and Raymond St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
Huron Ave, between Concord Ave. and Raymond St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan. Streets and Sidewalks Completed Project
Huron Ave and Cushing Plaza Improvements Project
As part of the Five-Year Street and Sidewalk Reconstruction Plan, Huron Ave, from Fresh Pond Place to Fresh Pond Parkway, is scheduled for reconstruction. This project will include paving, sidewalk improvements and utility installations. Cushing Plaza, located at Cushing Street and Huron Avenue, is scheduled for reconstruction to allow stormwater to infiltrate and provide enhanced biochar and compost soil for the new trees and garden plantings.
As part of the Five-Year Street and Sidewalk Reconstruction Plan, Huron Ave, from Fresh Pond Place to Fresh Pond Parkway, is scheduled for reconstruction. This project will include paving, sidewalk improvements and utility installations. Cushing Plaza, located at Cushing Street and Huron Avenue, is scheduled for reconstruction to allow stormwater to infiltrate and provide enhanced biochar and compost soil for the new trees and garden plantings. Current Construction
Huron B Improvements
Phase 2 of the Alewife Brook Sewer Separation Project.
Phase 2 of the Alewife Brook Sewer Separation Project. Sewer and Stormwater Completed Project
Inman Square
Inman Square Intersection Improvements
Inman Square Intersection Improvements Traffic Calming Completed Project
Irving Street and Scott Street
Reconstruction of Irving Street & Scott Street
Reconstruction of Irving Street & Scott Street Streets and Sidewalks Completed Project
Kenwood Street
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
Roadway paving, sidewalk reconstruction, pedestrian ramp installations Streets and Sidewalks Completed Project
King Open and Cambridge Street Upper Schools & Community Complex Project
King Open and Cambridge Street Upper Schools & Community Complex Project
King Open and Cambridge Street Upper Schools & Community Complex Project City Managers Office Current Construction
Kinnaird Street Reconstruction
Reconstruction of Kinnaird Street
Reconstruction of Kinnaird Street Streets and Sidewalks Completed Project
Kirkland Road Reconstruction Project
Kirkland Road from Kirkland Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
Kirkland Road from Kirkland Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Land Boulevard Infrastructure Improvements Project
Infrastructure Improvement Project on Land Boulevard at Binney Street
Infrastructure Improvement Project on Land Boulevard at Binney Street Sewer and Stormwater Completed Project
Lawn St Reconstruction
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
Roadway paving, sidewalk reconstruction, pedestrian ramp installations Streets and Sidewalks Completed Project
Longfellow Road
Reconstruction of Longfellow Road
Reconstruction of Longfellow Road Streets and Sidewalks Completed Project
Main Street Reconstruction Project
Reconstruction of Main Street in Kendall Square
Reconstruction of Main Street in Kendall Square Streets and Sidewalks Completed Project
Maple Ave Reconstruction Project
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks In Planning
Mass Ave Improvements - Harvard Square
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Plymton to Garden.
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Plymton to Garden. Streets and Sidewalks Public Works
Mass Ave Partial Construction
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Dudley to Beech and Roseland to Waterhouse.
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Dudley to Beech and Roseland to Waterhouse. Streets and Sidewalks In Planning
Massachusetts Ave Reconstruction Project
Linnaean St to Upland Rd
Linnaean St to Upland Rd Streets and Sidewalks Completed Project
Massachusetts Avenue Reconstruction
Everett Street to Linnaean Street & Beech Street to Russell Street
Everett Street to Linnaean Street & Beech Street to Russell Street Streets and Sidewalks Completed Project
Meacham Woodbridge Shea Locke
Street/ sidewalk reconstruction on Meacham Road, Woodbridge Street, Shea Road, Locke Street.
Street/ sidewalk reconstruction on Meacham Road, Woodbridge Street, Shea Road, Locke Street. Streets and Sidewalks Completed Project
Mead Street Reconstruction
Reconstruction of Mead Street
Reconstruction of Mead Street Streets and Sidewalks Completed Project
Monsignor O'Brien Highway Reconstruction - Phase 2A (Lechmere Canal Outfall)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years. Streets and Sidewalks Completed Project
Monsignor O'Brien Hwy Reconstruction - Phase 1 (Third St. to Gore St.)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years. Streets and Sidewalks Completed Project
Montgomery Street Reconstruction Project
Montgomery Street between Harvey St. and Rindge Ave. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Montgomery Street between Harvey St. and Rindge Ave. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Public Works
Mt. Auburn Street Reconstruction
Gibson Street to Fresh Pond Parkway
Gibson Street to Fresh Pond Parkway Streets and Sidewalks Completed Project
Myrtle/Magnolia Ave Project
Includes Myrtle Ave, Magnolia Ave, Hovey Ave, Lamont Ave
Includes Myrtle Ave, Magnolia Ave, Hovey Ave, Lamont Ave Sewer and Stormwater Completed Project
New Street Infrastructure and Streetscape Improvements and Concord Lane Sewer Separation Project
New St from Bay State Rd to the railroad tracks and Concord Lane
New St from Bay State Rd to the railroad tracks and Concord Lane Streets and Sidewalks Completed Project
Newport Road and Roseland Street Infrastructure Improvements
Newport Road and Roseland Street Infrastructure Improvements
Newport Road and Roseland Street Infrastructure Improvements Sewer and Stormwater Completed Project
Norfolk Street Reconstruction Project
Norfolk Street from Broadway to the Somerville line is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
Norfolk Street from Broadway to the Somerville line is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
O'Connell Library Pocket Park
Construction of a small park in the front and on the sides of O'Connell Library.
Construction of a small park in the front and on the sides of O'Connell Library. Parks Completed Project
Pacific Street Dog Park
Improvements to the Pacific Street Dog Park.
Improvements to the Pacific Street Dog Park. Parks Completed Project
Park Ave Road Reconstruction Project
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020.
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020. Streets and Sidewalks Current Construction
Parker and Healey Streets
Road and Sidewalk Reconstruction
Road and Sidewalk Reconstruction Streets and Sidewalks Completed Project
Pearl Street Reconstruction Project
Reconstruction of Pearl Street from Massachusetts Avenue to Granite St.
Reconstruction of Pearl Street from Massachusetts Avenue to Granite St. Streets and Sidewalks Completed Project
Pemberton Street Court Renovation
Resurfacing of Tennis Courts and Basketball Courts
Resurfacing of Tennis Courts and Basketball Courts Parks Completed Project
Pleasant Street intersection at Fairmont Street Reconstruction
Pleasant Street/Fairmont Street Intersection
Pleasant Street/Fairmont Street Intersection Streets and Sidewalks Completed Project
Porter/Harding Streets
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
Roadway paving, sidewalk reconstruction, pedestrian ramp installations Streets and Sidewalks Completed Project
Prentiss Street Reconstruction
Includes Massachusetts Ave to the Somerville Line, Oxford St from Garfield to Forest (sewer only)
Includes Massachusetts Ave to the Somerville Line, Oxford St from Garfield to Forest (sewer only) Sewer and Stormwater Completed Project
Richard Ave and Muller Ave
Roadway & Sidewalk Reconstruction
Roadway & Sidewalk Reconstruction Streets and Sidewalks Completed Project
River Street Reconstruction Project
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project. The project includes utility and surface reconstruction of the following streets and public spaces: • River Street from Memorial Drive to Massachusetts Avenue • Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square) • The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza • Pleasant Street and Tubman Square between Pleasant Place and River Street • Green Street between Magazine and Pearl Street • Magazine Street between Franklin and Green Street • Blackstone Street In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan • Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project. The project includes utility and surface reconstruction of the following streets and public spaces: • River Street from Memorial Drive to Massachusetts Avenue • Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square) • The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza • Pleasant Street and Tubman Square between Pleasant Place and River Street • Green Street between Magazine and Pearl Street • Magazine Street between Franklin and Green Street • Blackstone Street In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan • Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road Streets and Sidewalks Current Construction
Route 2 / Route 16 intersection
MassDOT project - scheduled to be completed Spring 2016
MassDOT project - scheduled to be completed Spring 2016 Streets and Sidewalks Completed Project
Russell Field Path Maintenance Improvement Project
The City of Cambridge and MBTA have been working together to develop a maintenance improvement project to address the issues on the Russell Field Path which is owned and maintained by the MBTA.
The City of Cambridge and MBTA have been working together to develop a maintenance improvement project to address the issues on the Russell Field Path which is owned and maintained by the MBTA. Multi-Use Path Completed Project
Russell Field Renovation Project
The City is developing plans to renovate Russell Field and the adjacent practice field area. Plans include the resurfacing of both playing fields and site amenities to improve the functionality of the facility.
The City is developing plans to renovate Russell Field and the adjacent practice field area. Plans include the resurfacing of both playing fields and site amenities to improve the functionality of the facility. Parks Completed Project
Sacramento Field Improvements
Park renovation and improvements
Park renovation and improvements Parks Current Construction
Sciarappa St Reconstruction Project
Sciarappa Street from Charles St. to Winter St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Sciarappa Street from Charles St. to Winter St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks In Planning
Second Street Reconstruction
Rogers Street to Charles Street & Hurley Street to Gore Street
Rogers Street to Charles Street & Hurley Street to Gore Street Streets and Sidewalks Completed Project
Sennott Park Renovation Project
The City is planning to make repairs and modest improvements to Sennott Park. Construction is anticipated to begin late Summer 2021
The City is planning to make repairs and modest improvements to Sennott Park. Construction is anticipated to begin late Summer 2021 Parks Completed Project
Sewer Cleaning and Lining
The City's contractor, National Water Main, is performing "cured-in-place" pipeling around the City. this process provides a new, jointless sewer pipe connection that minimizes root and water infiltration problems, improves flow and provides for a more structurally sound pipe without the need for excavation.
The City's contractor, National Water Main, is performing "cured-in-place" pipeling around the City. this process provides a new, jointless sewer pipe connection that minimizes root and water infiltration problems, improves flow and provides for a more structurally sound pipe without the need for excavation. Sewer and Stormwater Public Works
Shepard Street Reconstruction Project
Shepard Street from Garden Street to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
Shepard Street from Garden Street to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Sherman Street Drainage Improvements
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments.
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments. Sewer and Stormwater Current Construction
Sherman Street Reconstruction
Garden Street to Walden Street
Garden Street to Walden Street Streets and Sidewalks Completed Project
Simard Building Reconstruction Project
The Simard building, located at the Department of Public Works campus, 147 Hampshire St., is slated for renovations.
The Simard building, located at the Department of Public Works campus, 147 Hampshire St., is slated for renovations. Buildings Public Works
Sixth Street Reconstruction Project
Sixth Street between Cambridge Street and Bent Street is currently scheduled for roadway work in the summer of 2018 as part of the City's 5 Year Street & Sidewalk Plan.
Sixth Street between Cambridge Street and Bent Street is currently scheduled for roadway work in the summer of 2018 as part of the City's 5 Year Street & Sidewalk Plan. Streets and Sidewalks Completed Project
St Mary Road Reconstruction Project
St. Mary Road, between Inman Street and Prospect Street, is scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
St. Mary Road, between Inman Street and Prospect Street, is scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan. Streets and Sidewalks Completed Project
Talbot Street Outfall
MIT in collaboration with the City of Cambridge is planning to install a new drainage structure from Talbot Street to the Charles River to improve stormwater management in the area due to current and future development. The project will begin construction in October of this year and continue through to the Fall of 2019.
MIT in collaboration with the City of Cambridge is planning to install a new drainage structure from Talbot Street to the Charles River to improve stormwater management in the area due to current and future development. The project will begin construction in October of this year and continue through to the Fall of 2019. Sewer and Stormwater Current Construction
Taylor Square Fire Station Improvement Project
Beginning Spring 2019 and lasting for approximately 12 months, several improvements will be taking place at the Taylor Square Fire Station. Work will be taking place on the interior and exterior of the building. See below for project updates, timeline and additional info.
Beginning Spring 2019 and lasting for approximately 12 months, several improvements will be taking place at the Taylor Square Fire Station. Work will be taking place on the interior and exterior of the building. See below for project updates, timeline and additional info. Buildings Completed Project
The Martin Luther King Jr. School Construction Project
MLK School Construction Project
MLK School Construction Project City Managers Office Completed Project
The Port Infrastructure Improvements Project
Construction of water, sewer, drainage, street and sidewalk improvements in The Port
Construction of water, sewer, drainage, street and sidewalk improvements in The Port Sewer and Stormwater Current Construction
Thorndike Street Reconstruction Project
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement.
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement. Streets and Sidewalks Current Construction
Timothy J. Toomey, Jr. Park
Formerly known as Rogers St. Park, this new City park is being constructed at 71 Rogers St.
Formerly known as Rogers St. Park, this new City park is being constructed at 71 Rogers St. Parks Completed Project
Tobin Montessori & Vassal Lane Upper Schools Project
The Cambridge Public Schools’ Innovation Agenda will result in the creation of four new upper school campuses serving students in grades 6 to 8. The Tobin and Vassal Lane Upper Schools, located at 197 Vassal Lane, Cambridge, will be the third school to be redesigned.
The Cambridge Public Schools’ Innovation Agenda will result in the creation of four new upper school campuses serving students in grades 6 to 8. The Tobin and Vassal Lane Upper Schools, located at 197 Vassal Lane, Cambridge, will be the third school to be redesigned. City Managers Office Current Construction
Tremont Street Raised Intersection
Traffic Calming at Tremont/Gardner
Traffic Calming at Tremont/Gardner Traffic Calming Completed Project
Tufts Street Reconstruction
Magazine Street to Pearl Street
Magazine Street to Pearl Street Streets and Sidewalks Completed Project
Updated Combined Sewer Overflow (CSO) Control Plan
The City of Cambridge, the City of Somerville, and the Massachusetts Water Resources Authority are collaborating on CSO Control plans to protect and improve our water resources.
The City of Cambridge, the City of Somerville, and the Massachusetts Water Resources Authority are collaborating on CSO Control plans to protect and improve our water resources. Sewer and Stormwater Public Works
War Memorial Tennis Courts Resurfacing and Drainage Project
The CRLS Tennis Courts will be under construction from late July to early September
The CRLS Tennis Courts will be under construction from late July to early September Parks Completed Project
Waterhouse Street
Street/ sidewalk reconstruction on Waterhouse Street.
Street/ sidewalk reconstruction on Waterhouse Street. Streets and Sidewalks Completed Project
Webster Avenue
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan. Streets and Sidewalks Current Construction
Western Ave Reconstruction Project
Includes Western Ave from Green St. to Memorial Dr.
Includes Western Ave from Green St. to Memorial Dr. Streets and Sidewalks Completed Project
Willard Street Drainage Improvement Project
The main goal of the Willard Street Drainage Improvement Project is to address stormwater flooding of the street and abutting properties. The project also provides an opportunity to upgrade other obsolete utilities and provide surface improvements including accessible sidewalks and traffic calming.
The main goal of the Willard Street Drainage Improvement Project is to address stormwater flooding of the street and abutting properties. The project also provides an opportunity to upgrade other obsolete utilities and provide surface improvements including accessible sidewalks and traffic calming. Sewer and Stormwater Current Construction

Will I be able to get out of my driveway or walk down the street during construction?

If any work is scheduled to be performed directly in front of your driveway, the contractor will notify you directly regarding the accessibility timeline. Pedestrian access will be maintained at all times. if you live on a road that has a bicycle lane, the contractor will try to maintain a bicycle lane around the work zone. If that is not possible, crews will post signage in the area to alert cyclists that the bicycle lane ends and to alert motorists that they should "Share the Road" with cyclists.

How can I receive updates about construction in my neighborhood?

Click on the "Sign Up" button on the Contact tab of the project page or go to cambridgema.gov/subscribe to search for mailing lists. 

Page was last modified on 3/4/2024 6:56 PM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc.