Northeast Sector Project

Photos from the Northeast Sector Project. Visit the project page to learn more: Northeast Sector Project.

  • Beginning construction at Lusitania.

    Beginning construction at Lusitania.

  • Beginning construction behind Neville Manor.

    Beginning construction behind Neville Manor.

  • Erosion control fabric is placed below Neville Manor.

    Erosion control fabric is placed below Neville Manor.

  • The base is dug behind Neville Manor for the community garden.

    The base is dug behind Neville Manor for the community garden.

  • The bases for the elevated gardens are placed.

    The bases for the elevated gardens are placed.

  • The concrete base for the elevated garden beds during construction.

    The concrete base for the elevated garden beds during construction.

  • Butterfly Meadow after grading.

    Butterfly Meadow after grading.

  • Fill placed for grading.

    Fill placed for grading.

  • Re-grading along Concord Ave.

    Re-grading along Concord Ave.

  • Paths being graded throughout the Northeast Sector.

    Paths being graded throughout the Northeast Sector.

  • Sand filled over soccer field.

    11 Soccer Field Sand

    Sand filled over soccer field.

  • Path constructed throughout community gardens.

    Path constructed throughout community gardens.

  • Elevated garden beds nearing completion.

    Elevated garden beds nearing completion.

  • Stabilized aggregate placed on pathways.

    Stabilized aggregate placed on pathways.

  • Stabilized aggregate pathway.

    Stabilized aggregate pathway.

  • Plantings placed along Beech Path.

    Plantings placed along Beech Path.

  • Plantings placed in Lusitania Woods.

    Plantings placed in Lusitania Woods.

  • Drainage channels being constructed in Butterfly Meadow.

    Drainage channels being constructed in Butterfly Meadow.

  • Bike rack and bench placed at the soccer field.

    19 Soccer Field

    Bike rack and bench placed at the soccer field.

  • Drainage pipes placed in Lusitania Meadow.

    Drainage pipes placed in Lusitania Meadow.

  • Plantings placed in Maher Park.

    Plantings placed in Maher Park.

  • Water pipes placed in Maher Park.

    Water pipes placed in Maher Park.

  • Filter berm constructed in Lusitania wetland.

    Filter berm constructed in Lusitania wetland.

  • Lusitania drainage during construction.

    Lusitania drainage during construction.

  • Grading Lusitania Meadow.

    Grading Lusitania Meadow.

  • Grading Lusitania Meadow.

    Grading Lusitania Meadow.

  • Soil stabilized at Maher Park.

    Soil stabilized at Maher Park.

  • Wet meadow construction at Lusitania.

    Wet meadow construction at Lusitania.

  • Grading at Lusitania.

    Grading at Lusitania.

  • Paving the Perimeter Road along Lusitania.

    Paving the Perimeter Road along Lusitania.

  • Pathway construction through Lusitania Field.

    Pathway construction through Lusitania Field.

  • Lusitania running path during construction.

    Lusitania running path during construction.

  • Meadow plantings.

    Meadow plantings.

  • Meadow plantings and seeding.

    Meadow plantings and seeding.

  • Irrigation testing at Maher Park.

    Irrigation testing at Maher Park.

  • Spreading sod at Maher Park.

    Spreading sod at Maher Park.

  • Maher Park completed.

    Maher Park completed.

  • Plantings in the wet meadow at Lusitania.

    Plantings in the wet meadow at Lusitania.

  • Planting the wet meadow at Lusitania.

    Planting the wet meadow at Lusitania.

  • Butterfly Meadow completed.

    Butterfly Meadow completed.

  • Lusitania wetland completed.

    Lusitania wetland completed.

  • Flowers in Butterfly Meadow.

    Flowers in Butterfly Meadow.

  • Butterfly Meadow

    Butterfly Meadow

  • Lusitania Meadow

    Lusitania Meadow

  • Maher Park Entrance Sign

    Maher Park Entrance Sign

  • Lusitania Meadow after restoration.

    Lusitania Meadow after restoration.