NOTICE: DPW offices at 147 Hampshire St. are open to the public, by appointment only, on Mondays and Thursdays from 10:00 a.m. to 3:00 p.m. Appointments can be made by phone at 617-349-4800 or by email at theworks@cambridgema.gov. Individual staff are also available for appointments outside of these hours as needed; please contact the office with the details of your issue, and we will coordinate with the appropriate staff member. Many DPW services can be provided online, and DPW phones are staffed 24/7 to respond to urgent concerns.

River Street Reconstruction

The River Street Reconstruction project will upgrade the sanitary sewer, stormwater and water subsurface infrastructure while developing a new surface design for River Street, the bus terminal area at River and Magazine Streets near Central Square, and Carl Barron Plaza. The project aims to create a streetscape design that meets the needs of all the various users and in a way that engages the local community, contributes to overall enhancement of the neighborhood, and meets the City’s goals related to infrastructure, transportation, and urban design.

The concurrent design of Carl Barron Plaza, the significant open space at the heart of Central Square will include consideration of public art, fixed and/or unfixed furniture, access, plantings, and landscaping. The design must also consider the complexity of transportation needs related to the bus bays adjacent to the Plaza and people moving through the plaza.

The community outreach and design processes will occur throughout 2019 and into early 2020. Construction is anticipated to begin in Spring 2020.

While this project is still in development, all project updates can be found on the Community Development Department's Project Page

The design process for the River Street project will begin in November 2018 with data collection (topographic survey; transportation and parking counts; etc.)

A detailed project schedule will be developed later in 2018. In general, the Community Outreach and Design Processes will occur throughout 2019 and into early 2020.

Construction is anticipated to begin in Spring 2020.

Bill Deignan, Transportation Planner

bdeignan@cambridgema.gov

Page was posted on 2/11/2019 4:25 PM
Page was last modified on 5/28/2020 10:00 AM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via Commonwealth Connect for things like missed trash pickups, potholes, etc., click here