The city's contractor is expected to begin park improvements during the week of April 18.  We expect the work to be complete in the fall 2017.

Please check back for updates.


The City's contractor, J&J Sacca, is expected to mobilize during the week of April 18 to begin improvements. Crews will continue throughout the construction season and anticipate reopening the park in late fall, 2017.


Please check back for updates.


The City of Cambridge is planning a comprehensive renovation of Sacramento Field, which is an approximately 1.2 acre neighborhood park located off Sacramento Street (between Massachusetts Avenue and Oxford Street).


New features include:


  • Two Park Entrances: To create two entrances to the park that are visible, accessible, safe and well-identified by park signage providing a convenient way for the neighborhood to access the park.
  • StaLok path:  Crews will install a circular path around the field made from StaLok; a natural paving material that meets ADA compliance.
  • Open Space: To preserve the openness of the field to support a variety of active and passive activities. Staff met with Cambridge Youth Soccer (CYS) leadership on multiple occasions to understand space needs for both games and informal soccer practice. The design concept will be able to meet youth soccer field space needs as confirmed by CYS leadership.
  • Enclosed Tot Lot and Entrance Gates: Commitment to include a 20 x 40 ft. enclosed flat toddler play area to accommodate younger children that includes seating, a sand play area and an additional infant and toddler play structure that includes a slide, cleated toddler incline, toddler stairs, steering wheel, mirrored panel, and deck with covering. Additional commitment to add gates upon entry to the field at both park entrances.
  • Nature-based Play Area: To include a reimagined natural-based play area that achieves a less artificial look. The design will be able to accommodate winter sledding.
  • Sitting areas and other Park Amenities: To provides amenities that currently do not exist including seating and tables, bike parking, message board, historical marker, benches, and a water fountain.
  • Commitments to Sacramento Community Garden: The square footage loss from the community garden for the new path will be replaced with an equivalent amount of area at the back of the garden. Selective tree pruning management over a period of several years will be undertaken by the City Arborist, including removal of the mulberry tree. In addition, there will be new garden fencing and gates, water spigot, message board, and raised planter beds. Sequencing of improvements will be carefully worked out in advance with gardeners.
  • Landscaping Improvements: To incorporate landscaping improvements with native tree plantings as well as buffer planting of shrubs and vines to visually soften the edges, create shade, attract birds, and give more privacy to abutters
  • Multi-Use Hard Surface Ball Court: To resurface and re-line the court, replace the timber retaining wall with masonry wall, and fencing.
  • Off-Leash Shared Use Hours: To pilot off-leash hours that will allow for dogs to be off leash during designated morning hours (dogs and owners must be in compliance with the City’s off-leash regulations).
  • Drainage and Storm Water Management Improvements: The City will ensure that when the field is redone, it will have grades that better cooperate with the catch basins, e.g. a crown in the center of the field to take water to basins better. In addition, DPW has renewed a commitment to maintain the nine catch basins on a regular schedule.


For more background on the project, please visit the Community Development's webpage.

For questions related to the park construction, please contact Kelly Dunn, DPW Community Relations Manager at 617.349.4870/ kdunn@cambridgema.gov.

How can we help you? I'd like...

Service Requests

Commonwealth Connect Promo

Cambridge citizen requests, now online & on the go! Report issues here.

FAQ's

Have a question?
Find the answer in our extensive
Frequently Asked Questions

Dept of Public Works

147 Hampshire St
Cambridge MA 02139

Phone:617.349.4800
TDD:617.499.9924

Hours of Service

Monday: 8:30am-8:00pm
Tuesday-Thursday: 8:30am-5:00pm
Friday: 8:30am-12 noon
24 Hour emergency 617.349.4860

RECYCLING CENTER HOURS

Tuesday & Thursday: 4:00pm-7:30pm
Saturday: 9:00am-4:00pm

Owen O'Riordan
Commissioner