U.S. flag

An official website of the United States government

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Road being paved

City Construction Projects

Complete Streets Approach

The City of Cambridge is committed to improving the roadways, sidewalk and utilities to make them safe for all users. The construction season in Cambridge runs from mid-April through November, weather permitting. Work may be done outside of the official construction season if it doesn’t interfere with snow removal. To learn more about how City streets are prioritized for reconstruction, please visit the 5 Year Sidewalk and Street Reconstruction Plan

  • City Construction Projects- For detailed information about City construction projects, see below. You can filter for projects In Planning, In Construction or Completed. These construction projects may also be viewed as a map. You can sign up to receive email updates for any of the projects by going to the “Contact” tab of the project page.
  • University Construction Projects- Harvard University Construction information can be found here, MIT Construction Information can be found here
  • Utility Construction and Private Development Projects- For all other construction updates, including work being done by the Cambridge Water Department, Cambridge Electric Department, Eversource, other utility companies and large private development projects, click here.

Filter  
Close  
Displaying 1-10 of 20 results
Project Name & Description Description Type Status
Green Line Extension Project
The Green Line Extension is a top transportation priority of the Commonwealth.
The Green Line Extension is a top transportation priority of the Commonwealth. Transit Current Construction
Talbot Street Outfall
MIT in collaboration with the City of Cambridge is planning to install a new drainage structure from Talbot Street to the Charles River to improve stormwater management in the area due to current and future development. The project will begin construction in October of this year and continue through to the Fall of 2019.
MIT in collaboration with the City of Cambridge is planning to install a new drainage structure from Talbot Street to the Charles River to improve stormwater management in the area due to current and future development. The project will begin construction in October of this year and continue through to the Fall of 2019. Sewer and Stormwater Current Construction
Sacramento Field Improvements
Park renovation and improvements
Park renovation and improvements Parks Current Construction
Thorndike Street Reconstruction Project
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement.
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement. Streets and Sidewalks Current Construction
Graham and Parks School Improvements
Building & Park Improvements
Building & Park Improvements Buildings Current Construction
Fairmont Rockwell Laurel Kelly Sidewalk and Street Improvements Project
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd. Streets and Sidewalks Current Construction
Binney Street Park
Binney Street Park, located between Binney Street and Broadway along Galileo Galilei Way, is one of three new City open spaces in eastern Cambridge. The design of the park was guided by the Eastern Cambridge/Kendall Square Open Space (ECKOS) Study and Connect Kendall Square Open Space Competition, which resulted in a framework plan for the overall network of open spaces in eastern Cambridge. This new park will feature a variety of tree plantings, a dog run, lounge and play surfaces, and will include a segment of the Grand Junction Greenway.
Binney Street Park, located between Binney Street and Broadway along Galileo Galilei Way, is one of three new City open spaces in eastern Cambridge. The design of the park was guided by the Eastern Cambridge/Kendall Square Open Space (ECKOS) Study and Connect Kendall Square Open Space Competition, which resulted in a framework plan for the overall network of open spaces in eastern Cambridge. This new park will feature a variety of tree plantings, a dog run, lounge and play surfaces, and will include a segment of the Grand Junction Greenway. Parks Current Construction
City Hall Facade Restoration Project
The City will soon begin a façade restoration project at City Hall. Construction is anticipated to start in fall 2023 and take approximately 15 months to complete.
The City will soon begin a façade restoration project at City Hall. Construction is anticipated to start in fall 2023 and take approximately 15 months to complete. Current Construction
Franklin St. Reconstruction Project
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018.
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018. Streets and Sidewalks Current Construction
Sherman Street Drainage Improvements
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments.
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments. Sewer and Stormwater Current Construction

Will I be able to get out of my driveway or walk down the street during construction?

If any work is scheduled to be performed directly in front of your driveway, the contractor will notify you directly regarding the accessibility timeline. Pedestrian access will be maintained at all times. if you live on a road that has a bicycle lane, the contractor will try to maintain a bicycle lane around the work zone. If that is not possible, crews will post signage in the area to alert cyclists that the bicycle lane ends and to alert motorists that they should "Share the Road" with cyclists.

How can I receive updates about construction in my neighborhood?

Click on the "Sign Up" button on the Contact tab of the project page or go to cambridgema.gov/subscribe to search for mailing lists. 

Page was last modified on 3/4/2024 6:56 PM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc.