Pipe Lining Notice for Amory Street

caution sign The information on this page may be outdated as it was published 8 years ago.

As part of the Trenchless Rehabilitation Program for sewer and stormwater infrastructure, the city’s contractor, Insituform, will be rehabilitating the sewer mains using a method known as cast-in-place pipe (CIPP) lining. This system will provide a new structurally sound sewer pipe that will significantly reduce root and water infiltration problems and improve flow. This CIPP lining work does not require excavation; however, trucks and equipment will be onsite to complete the work. No Parking signs will be posted at least 24 hours in advance. Please check daily for No Parking signs. Police officers will be on site to assist with vehicle and cycling traffic and pedestrians.

Work hours are 7am until completion of work which is up to 10 hours each day. There will be a temporary disruption of sewer service to your residence or business during this time. Affected properties will receive two hand delivered notices. The first notice will be distributed several days in advance, and the second will be a 24-hour notice. It is very important to limit water use on the day specified in the notice. 

Below is the schedule for Friday, March 11, weather permitting:
  • Amory Street between Broadway and St Mary’s Road 

Below is the schedule for the week of March 14, weather permitting:
  • Monday March 14: St Mary’s Road, Amory Street between St Mary’s Road and 115-117/116 Amory Street
  • *Tuesday March 15: Amory Street between 115-117/116 Amory Street and Hampshire Street

*Work will begin at 9am to minimize traffic impacts on Hampshire Street.


Contact information:
  • Insituform Site Superintendent - Henry Boissonneault, 774-200-8404
  • Insituform Project Engineer - Tom Bronczyk, 508-277-1030
  • Department of Public Works Field Inspector, Lou Mothon, 617-349-4828
Page was last modified on 7/25/2023 3:36 AM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc., click here