Hazardous Materials Emergency Response Plan

Since the construction of the Stony Brook and Hobbs Brook Reservoirs in the 1890s, major growth in the region’s transportation network and changes in land use patterns have brought significant development and highway infrastructure to the area surrounding both reservoirs.  The City of Cambridge has taken preemptive steps to facilitate a rapid response to protect the water supply should a hazardous material be released in or near it.  Furthermore, since the reservoirs are located outside the City of Cambridge, there is a need to involve the four communities in the watershed - Lexington, Lincoln, Waltham, and Weston - as well as several key state agencies to ensure fast response in the event of an emergency.

Under the 2003 Emergency Reponse Plan  and 2006 update, the Cambridge Water Department has identified the following stages in emergency management that help reduce overall risk to the water supply.

1. Mitigation

Common mitigation measures used throughout the watershed are zoning and land use controls, barrier construction, and best management practices (BMPs) to minimize the access of hazardous materials to the Cambridge Water Supply.  MassDOT has begun diverting highway runoff away from reservoirs into detention ponds that allow particulates to settle out of stormwater and allow more time for First Responders to clean up spills in the event of an emergency. 

2. Preparedness

Hazardous materials response equipment is available to responders at six locations in the upper watershed.  The Waltham Fire Department, which would be the first responder for most of the area around the two reservoirs, is trained and drilled on the use of the equipment.  In addition, a Hazmat Atlas showing all highway outfalls, stormwater/spill retention basins and equipment storage locations has been developed and distributed to all watershed First Responders.  This atlas is updated on a regular basis to reflect to additions or changes to the local drainage infrastructure.

Oil boom placement in primary tributary for HAZMAT training.

Practice containment-boom deployment in Hobbs Brook.

3. Response

In the event of a hazardous material introduction into the watershed, first responders immediately take action to contain and remove hazardous materials from the watershed.  After the materials have been contained, assessment of the environmental impact and remediation, if needed, will be conducted to ensure a safe raw water supply for the Water Treatment Plant.

4. Recovery

In the event of a hazardous materials emergency, safe drinking water will be supplied to Cambridge residents from the unaffected source waters or from a MWRA-supplied emergency water main.  The hazardous materials will be remediated in order to restore the watershed health and to secure the viability of the supply water for future use.