pdf
|
2008-2011 Source Water Quality Report
The annual Source Water Quality Report for 2008-2011.
|
Watershed
|
Reports
|
pdf
|
2011 Surface Water Supply Protection Plan
The Cambridge Water Department 2011 Surface Water Supply Protection Plan.
|
Watershed
|
Reports
|
pdf
|
2012 Source Water Quality Report
The annual Source Water Quality Report for 2012.
|
Watershed
|
Reports
|
|
2013 Fire Hydrant Flushing Schedule
2013 Fire Hydrant Flushing Schedule
|
|
|
pdf
|
2013 Source Water Quality Report
The annual source water quality report for 2013.
|
Watershed
|
Reports
|
pdf
|
2014 CCR
Cambridge Water Department 2014 CCR
|
|
|
pdf
|
2014 Source Water Quality Report
The 2014 Source Water Quality Report.
|
Watershed
|
Reports
|
pdf
|
2015 Site Monitoring Report
Highlights include: a proposed wet meadow restoration project in Weston, ongoing construction and improvements along Route 2 and 128 that will result in 5 new stormwater treatment and spill containment basins, improvements to 8 existing basins along Route 128, and the creation of vegetated swales in the Route 2 median.
|
|
|
pdf
|
2016 Annual Water Quality Report
2016 Annual Water Quality Report
|
Brochure
|
Water Department
|
pdf
|
2016 Site Monitoring Report
Highlights include: Drainage improvements to the perimeter road at Fresh Pond at Glacken Slope, and completed Route 2 Bridge reconstruction and Rt. 128 resurfacing which included new best management practices.
|
|
|