|
2013 Fire Hydrant Flushing Schedule
2013 Fire Hydrant Flushing Schedule
|
|
|
pdf
|
2014 CCR
Cambridge Water Department 2014 CCR
|
|
|
pdf
|
2015 Site Monitoring Report
Highlights include: a proposed wet meadow restoration project in Weston, ongoing construction and improvements along Route 2 and 128 that will result in 5 new stormwater treatment and spill containment basins, improvements to 8 existing basins along Route 128, and the creation of vegetated swales in the Route 2 median.
|
|
|
pdf
|
2016 Site Monitoring Report
Highlights include: Drainage improvements to the perimeter road at Fresh Pond at Glacken Slope, and completed Route 2 Bridge reconstruction and Rt. 128 resurfacing which included new best management practices.
|
|
|
png
|
2016CALMAnalysis
Tabular results of LC Analysis from 2016 data
|
|
|
pdf
|
2017 Site Monitoring Report
Highlights include: Commencement of construction for the Drainage and Community Gardens project at Fresh Pond Reservation; proposed and ongoing development and redevelopment projects along Second Avenue, Bear Hill Road, and Winter Street in Waltham; and permitting and on-ongoing construction of a new Minuteman Vocational Technical High School in Lexington and Lincoln.
|
|
|
pdf
|
2018 Site Monitoring Report
Highlights include: Completion of the Drainage and Community Gardens project at Fresh Pond Reservation; drainage improvements along the Hobbs Brook Reservoir dam crest (Winter St) in Waltham; proposed, completed, and active development and redevelopment projects along Smith Street, Wyman Street, Second Avenue, Bear Hill Road, and Winter Street in Waltham; and active construction of a new Minuteman Vocational Technical High School in Lincoln.
|
|
|
pdf
|
2019 Algae Monitoring Report
This report presents the 2019 results from CWD's Algae Monitoring Program, part of an on-going study to assess source water quality in Cambridge reservoirs.
|
|
|
pdf
|
2019 Benthic Macroinvertebrate Report
In 2019, CWD analyzed benthic macroinvertebrates in four tributaries in the Cambridge surface water supply watershed. These results are presented in the 2019 Benthic Macroinvertebrate Report.
|
|
|
pdf
|
2019 Fresh Pond Reservation Class B Water Quality Report
This report presents the 2019 water quality monitoring results for three ponds on the Fresh Pond Reservation: Little Fresh Pond, Black’s Nook, and North Pond.
|
|
|