Gas Fees

Section: 15.04.010 Established-Work Started Prior to Obtaining Permit:

Where work for which a permit is required by this code is started or proceeded with, prior to obtaining such permit, the fee specified shall be tripled, but payment of such triple fee shall not relieve any person from fully complying with the requirements of this code in the execution of the work not from any other penalties prescribed in this code.

City Ordinance 15.08. & 15.12 Penalty for Starting Work Prior to Obtaining Permit:

Where work for which a permit is required by Electric Code/Plumbing Code is started or proceeded with, prior to obtaining such permit, the fee specified shall be tripled, but payment of such triple fee shall not relieve any person from fully complying with the requirements of this code in the execution of the work not from any other penalties prescribed in this code.

City Ordinance 15.08.020 & 15.12.020 Co-Work Completed By Others:

Any person, firm or corporation, other than electrical contractors/plumbing contractors or public service agencies, who employ one or more electricians/plumbers permanent to do electrical or plumbing work, may obtain a permit covering the work done by such permanent electrician/plumber for a period of time to be determined in each case.  The fee for electrical work/plumbing work done under such a permit for a period of time to be work done under such permit will be charged in the same manner as if separate permits had been given for each job.

Performing work without a permit: Triple the permit fee Failure to call for final inspection within 5 days of completion - $50.00



Re-Inspection Fee - $50.00

Description Fees
Gas
Boiler 1,000,000 BTU and over $100.00
Boiler/Chimney Vented $50.00
Boiler/Direct Vent $50.00
Booster $50.00
Breaching up to 4,000 BTU $50.00
Breaching 4,000 BTU and over $100.00
Chimney Liner $50.00
Conversion Burner $50.00
Cook Stove $20.00
Disconnect/Reconnect $50.00
Dryer $20.00
Fireplace-Insert Log $50.00
Fireplace-Outdoor Pit $50.00
Fryolater $50.00
Furnance/Chimney Vented $50.00
Furnance/Direct Vented $50.00
Gas Meter $25.00
Gas Piping (new per floor) $50.00
Generator $50.00
Grill $40.00
Infrared Heater $50.00
Kiln $50.00
Laboratory Cock $20.00
Make ip Air Unit Forced $50.00
Make ip Air Unit Gravity $50.00
Oven $50.00
Pool Heater $50.00
Roof Top Unit $40.00
Room Heater/Vented $50.00
Solenoid Valve $50.00
Temporary Heat $100.00
Test $25.00
Vent Damper $75.00
Water Heater $50.00