U.S. flag

An official website of the United States government

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Wastewater and Stormwater Management Guidance

In September 2026, the Cambridge Land Disturbance Regulations were revised to clarify project thresholds that determine stormwater requirements. A summary of public comment received and additional clarification in response to the comments is available here.

Under the revised Land Disturbance Regulations, projects in Cambridge fall into one of three categories for stormwater management based on project scope and size:

  1. Stormwater Control Permits
  2. DPW Stormwater Site Plan Review (under Building Permit)
  3. Small Projects with No Cambridge Stormwater Management Requirements

Project applicants should review the September 2026 Supplemental Directive below to determine which category your project falls into and associated stormwater requirements.  The September 2026 Supplemental Directive provides guidance on Cambridge stormwater standards, including sample calculations.

September 2026 Supplemental Directive to Wastewater and Stormwater Management Guidance

All project applicants should also review the DPW Site Plan Review Requirements document for submission requirements and items that must be addressed in advance of DPW sign off on the pre-approval of the Building Permit Application.

Small projects with no Cambridge Stormwater Management requirements are encouraged to use construction and landscaping projects as an opportunity to evaluate on-site drainage and make improvements. For projects of this scale, the City recommends stormwater improvements such as pervious walkways and patios, reducing impervious surfaces, dry wells, rain gardens and rain barrels. Project applicants are encouraged to review the City's Stormwater Site Improvement Recommendations and resources for Projects of this Size.

Stormwater Control Permits

For information regarding the Stormwater Control Permit and to apply online, click here. Refer to Appendix G below of the Wastewater and Stormwater Management Guidance Document below for checklists required for Stormwater Control Permits
 

Appendix A: Best Management Practices_Draft_March 2008
Appendix B: Common Pollutants_Draft_January 2008
Appendix C: TMDL Information (superseded by Sept 2026 Supplemental Directive)

Appendix D: Technical Basis for Stormwater Quantity Guidelines
Appendix E: Example Calculations for Water Quality Control (superseded by Sept 2026 Supplemental Directive)

Appendix F: Cambridge 2070 Projected Event (Superseded by September 2026 Supplemental Directive)
Appendix G: Stormwater Control Permit Checklists_September 2019

 

Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc.