Sherman Street Drainage Improvements

Project Image

The Walden Square inflow and infiltration (I&I) project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments.

The redesign of this area calls for the existing drain line under the surface lot in the Walden Square Apartments to be intercepted to allow storm water to be diverted to the existing storm water tank under the surface lot at Danehy Park. In order to accomplish this, a pipe needs to be installed under the utilities in Sherman Street. Once across the street the pipe will tie into the existing storm water tank. At the existing storm water tank, the diverted water will be held to discharge at ‘off peak’ times after a rain event, reducing the loads on the existing drain line in Sherman Street.


This project is complete. There will be no more updates to this page.


February 2023

Week Of 2/6/23 – 2/10/23

  • Work will occur in Danehy Park surface lot off of Sherman Street
  • A crane will be used on Monday and Tuesday to set large concrete structures.
  • Excavation for new drainage structures will continue.

Week of 2/13/23 – 2/17/23

  • Same as above, but work will also resume across the street in the Walden Square apartment parking lot.

Week Of 2/20/23 – 2/24/23

  • Work will occur in Danehy Park surface lot off of Sherman Street
  • A crane will be used on Friday to set large precast concrete structures into the excavation.

Week of 2/27/23 – 3/3/23

  • Connection of piping to precast concrete structures in the Danehy Park surface lot
  • Trucking of excess soil from site

What to expect during construction:

  • Work hours will be 7 a.m. to 4 p.m.
  • There will be increased truck traffic in and out of the Danehy Park surface lot.
  • Parking Spaces will be reduced during construction in the Danehy Park surface lot. Important Note: Handicap spaces have been relocated out of the contractor's staging area.
  • The Blue Bike station will be accessible from Sherman Street only.
  • The ChargePoint electric vehicle charging station will not be available during construction.

January 2023

Week of 1/9/2023
•The City's contractor, Bond Construction, will be working in Sherman Street, Danehy Park, and the Walden Square Apartments
•Excavation in Sherman Street is expected to be completed this week, weather depending.
•Structures will be installed on both sides of Sherman Street and tied together with the new drainage pipe. During the time of the pipe installation, Sherman Street maybe reduced down to one travel lane to perform this work. A police Detail will be on scene to direct pedestrians and vehicles.

Week of 1/16/2023
•Trench Paving will occur in Sherman Street. During the paving operation, Sherman Street maybe reduced down to one travel lane to perform this work. A police Detail will be on scene to direct pedestrians and vehicles.

Week Of 1/23/23 – 1/27/23
•Work will occur in Danehy Park surface lot off of Sherman Street
•Portions of parking spaces in Danehy Park surface lot have been blocked off during construction for materials and staging.
•Excavation will continue for new drainage structures and stockpiling soil for removal in Danehy Park surface lot.

Week of 1/30/23 – 2/3/23
•Same as above

Work is expected to be completed Spring 2023.  

General work hours are 7 a.m. to 3 p.m.

For questions related to this construction, please contact:

Kristen Kelleher
Community Relations Manager
617-349-4825
kkelleher@cambridgema.gov

Page was posted on 1/10/2023 12:38 PM
Page was last modified on 7/9/2024 4:57 PM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc.