Belmont Street Reconstruction Project
Belmont Street Reconstruction Project
|
Belmont Street Reconstruction Project
|
Streets and Sidewalks
|
Current Construction
|
Binney Street Park
Binney Street Park, located between Binney Street and Broadway along Galileo Galilei Way, is one of three new City open spaces in eastern Cambridge. The design of the park was guided by the Eastern Cambridge/Kendall Square Open Space (ECKOS) Study and Connect Kendall Square Open Space Competition, which resulted in a framework plan for the overall network of open spaces in eastern Cambridge. This new park will feature a variety of tree plantings, a dog run, lounge and play surfaces, and will include a segment of the Grand Junction Greenway.
|
Binney Street Park, located between Binney Street and Broadway along Galileo Galilei Way, is one of three new City open spaces in eastern Cambridge. The design of the park was guided by the Eastern Cambridge/Kendall Square Open Space (ECKOS) Study and Connect Kendall Square Open Space Competition, which resulted in a framework plan for the overall network of open spaces in eastern Cambridge. This new park will feature a variety of tree plantings, a dog run, lounge and play surfaces, and will include a segment of the Grand Junction Greenway.
|
Parks
|
Current Construction
|
Chestnut Street Reconstruction Project
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
Current Construction
|
City Hall Facade Restoration Project
The City will soon begin a façade restoration project at City Hall. Construction is anticipated to start in fall 2023 and take approximately 15 months to complete.
|
The City will soon begin a façade restoration project at City Hall. Construction is anticipated to start in fall 2023 and take approximately 15 months to complete.
|
|
Current Construction
|
Danehy Track and Field Construction Project
The track and field, installed in 2012, are at the end of their useful life and need to be replaced. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
|
The track and field, installed in 2012, are at the end of their useful life and need to be replaced. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
|
Parks
|
Current Construction
|
Elm St Reconstruction Project
Elm St Reconstruction Project
|
Elm St Reconstruction Project
|
Streets and Sidewalks
|
Current Construction
|
Fairmont Rockwell Laurel Kelly Sidewalk and Street Improvements Project
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
|
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
|
Streets and Sidewalks
|
Current Construction
|
Green Street Reconstruction Project
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
Current Construction
|
Huron Ave and Cushing Plaza Improvements Project
As part of the Five-Year Street and Sidewalk Reconstruction Plan, Huron Ave, from Fresh Pond Place to Fresh Pond Parkway, is scheduled for reconstruction. This project will include paving, sidewalk improvements and utility installations.
Cushing Plaza, located at Cushing Street and Huron Avenue, is scheduled for reconstruction to allow stormwater to infiltrate and provide enhanced biochar and compost soil for the new trees and garden plantings.
|
As part of the Five-Year Street and Sidewalk Reconstruction Plan, Huron Ave, from Fresh Pond Place to Fresh Pond Parkway, is scheduled for reconstruction. This project will include paving, sidewalk improvements and utility installations.
Cushing Plaza, located at Cushing Street and Huron Avenue, is scheduled for reconstruction to allow stormwater to infiltrate and provide enhanced biochar and compost soil for the new trees and garden plantings.
|
|
Current Construction
|
Inman Square
Inman Square Intersection Improvements
|
Inman Square Intersection Improvements
|
Traffic Calming
|
Current Construction
|
Park Ave Road Reconstruction Project
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020.
|
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020.
|
Streets and Sidewalks
|
Current Construction
|
River Street Reconstruction Project
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project.
The project includes utility and surface reconstruction of the following streets and public spaces:
• River Street from Memorial Drive to Massachusetts Avenue
• Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square)
• The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza
• Pleasant Street and Tubman Square between Pleasant Place and River Street
• Green Street between Magazine and Pearl Street
• Magazine Street between Franklin and Green Street
• Blackstone Street
In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan
• Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
|
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project.
The project includes utility and surface reconstruction of the following streets and public spaces:
• River Street from Memorial Drive to Massachusetts Avenue
• Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square)
• The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza
• Pleasant Street and Tubman Square between Pleasant Place and River Street
• Green Street between Magazine and Pearl Street
• Magazine Street between Franklin and Green Street
• Blackstone Street
In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan
• Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
|
Streets and Sidewalks
|
Current Construction
|
The Port Infrastructure Improvements Project
Construction of water, sewer, drainage, street and sidewalk improvements in The Port
|
Construction of water, sewer, drainage, street and sidewalk improvements in The Port
|
Sewer and Stormwater
|
Current Construction
|
Tobin Montessori & Vassal Lane Upper Schools Project
The Cambridge Public Schools’ Innovation Agenda will result in the creation of four new upper school campuses serving students in grades 6 to 8. The Tobin and Vassal Lane Upper Schools, located at 197 Vassal Lane, Cambridge, will be the third school to be redesigned.
|
The Cambridge Public Schools’ Innovation Agenda will result in the creation of four new upper school campuses serving students in grades 6 to 8. The Tobin and Vassal Lane Upper Schools, located at 197 Vassal Lane, Cambridge, will be the third school to be redesigned.
|
City Managers Office
|
Current Construction
|
Webster Avenue
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Streets and Sidewalks
|
Current Construction
|
Willard Street Drainage Improvement Project
The main goal of the Willard Street Drainage Improvement Project is to address stormwater flooding of the street and abutting properties. The project also provides an opportunity to upgrade other obsolete utilities and provide surface improvements including accessible sidewalks and traffic calming.
|
The main goal of the Willard Street Drainage Improvement Project is to address stormwater flooding of the street and abutting properties. The project also provides an opportunity to upgrade other obsolete utilities and provide surface improvements including accessible sidewalks and traffic calming.
|
Sewer and Stormwater
|
Current Construction
|