Monsignor O'Brien Highway Reconstruction - Phase 2A (Lechmere Canal Outfall)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
Walking Maps
Maps for each Cambridge Public School with recommended walking routes to school.
Riverside Neighborhood Study 2003
2003 report with recommendations developed by a study committee composed of neighborhood residents worked with CDD staff. Cover housing, land use and zoning, urban design, transportation, open space, institutional uses, and economic development. Updates 1992 report.