Roadway Paving of Various Locations on October 4th and 5th
Beginning September 26th, weather permitting, the City’s contractor, E J Paving, will be performing partial roadway milling (grinding) and paving operations to enhance the road conditions on several sections of streets around the City. The roadway grinding operation at each location is expected take two days followed by paving of the roadway later that same week, or the following week (weather permitting).
Kenwood Street
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
Cambridge's Disease Detectives Aim to Break the Chain of COVID-19 Transmission
Hundreds of Cambridge residents have learned they were infected with COVID-19 or had been exposed to the new coronavirus after getting a call from public health nurses from the Cambridge Public Health Department (CPHD). Thousands more have received calls from CPHD staff informing them of negative test results.