Kenwood Street
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
Roadway Preservation Work in Cambridge Week of September 8
The City’s Contractor, Indus, will conduct roadway preservation work the week of September 8. A truck will be spraying the roadway with a plant-based solution called Fog Seal. The solution goes down as a white, almost opaque spray, but once dry, it leaves a transparent “seal” over the pavement.
Glacken Slope Improvement Project
To improve runoff water quality by soil decompaction, erosion control, repaving the perimeter road with permeable asphalt, and native species and biodiversity restoration along Glacken Slope.
Huron Ave and Cushing Plaza Improvements Project
As part of the Five-Year Street and Sidewalk Reconstruction Plan, Huron Ave, from Fresh Pond Place to Fresh Pond Parkway, is scheduled for reconstruction. This project will include paving, sidewalk improvements and utility installations.
Cushing Plaza, located at Cushing Street and Huron Avenue, is scheduled for reconstruction to allow stormwater to infiltrate and provide enhanced biochar and compost soil for the new trees and garden plantings.