Safety Improvement Project on Cambridge Street Open House
In 2024, the City of Cambridge plans to install quick-build separated bike lanes and make related safety improvements on Cambridge Street between Inman Square and Second Street. We will start by introducing the project and gathering feedback that will help us draft designs for the street.
Danehy Park Environmental Monitoring and Reporting
Danehy Park is the site of a former landfill (see History section for more details). Since the landfill was capped in 1990, the management of the site is controlled by permitting through the Massachusetts Department of Environmental Protection (MassDEP), Division of Solid Waste. The goal is to ensure that the site is managed in a safe manner and that landfill gases are properly managed and allowed to vent safely. To that end, the City contracts with CDM Smith to conduct quarterly monitoring, inspect the methane trench (which is the stone-filled trench around the perimeter of the park) annually, and develop an annual environmental monitoring report that is submitted to MassDEP.