Grand Junction Multi-use Path
Grand Junction Multi-use Path project is a rail with trail alongside or within the Grand Junction railroad right of way, which is now primarily owned by the state, without precluding future transit on the corridor. The first segment was constructed in 2016 as part of the Grand Junction Park. Since then, the City committed $10 million for the design and construction of the path north of Broadway, and MIT committed $8.5 million and right-of-way for the design and construction on MIT-owned portions between Main Street and Pacific Street. In 2019 the City began the design process for the multi-use path between the Charles River at the BU Bridge and the Cambridge Somerville city line.
Paint by Sticker (Collins)
Choose a "Paint by Sticker" design and match the numbered stickers to the numbered spaces, then watch your artwork come alive. Recommended for children ages 6-12 and their caregivers.
Cambridgeport Neighborhood Study
2000 report of a study committee composed of neighborhood residents working with CDD staff covering housing, land use and zoning, urban design, transportation, open space, institutional uses, and economic development.
Green Building Annex
Article discussing the reconstruction of the City Hall Annex office building as a Green Building using the guidelines of the U.S. Green Building Council’s (USGBC) Leadership in Energy and Environmental Design (LEED) program.
Time Out for Public Art Tour: East Cambridge Neighborhood
Join us for a guided 60-minute art tour featuring public artwork in East Cambridge and learn about how Cambridge Arts commissions and maintains art for public enjoyment. We will visit three public artworks, and two sidewalk poems.
Meet at Centanni Park between the Multicultural Arts Center and the Middlesex South Registry of Deeds.
This event is part of our Time Out for Public Art series in collaboration with Cambridge Arts. In October, these will be 60-minute art tours where we visit multiple sites as a group. Registration is required.
Vacation Week: Scratch Art Tiles (Collins)
Create your own scratch art tiles. Begin with a black square and scratch a design to reveal the magical colors hidden beneath.
Recommended for children ages 6-12 and their caregivers.
Agassiz Neighborhood Study
Recommendations by a study committee composed of neighborhood residents working with CDD staff covering housing, land use and zoning, urban design, transportation, open space, institutional uses, and economic development.
East Cambridge Neighborhood Study
Recommendations by a 1989 study committee composed of neighborhood residents working with CDD staff covering housing, land use and zoning, urban design, transportation, open space, institutional uses, and economic development.
Raymond Park
The City of Cambridge will renovate Raymond Park in Neighborhood Nine. The design and community engagement process will begin in early 2024, and construction is anticipated to begin in 2025.