Agassiz Neighborhood Study
Recommendations by a study committee composed of neighborhood residents working with CDD staff covering housing, land use and zoning, urban design, transportation, open space, institutional uses, and economic development.
Paint by Sticker (Collins)
Choose a "Paint by Sticker" design and match the numbered stickers to the numbered spaces, then watch your artwork come alive. Recommended for children ages 6-12 and their caregivers.
East Cambridge Riverfront Plan
1978 study that serves as the blueprint for redevelopment of the East Cambridge "Triangle," as well as the urban design plan for the East Cambridge Riverfront and industrial area.
Neighborhood Nine Neighborhood Study
1996 recommendations from study committee composed of neighborhood residents working with CDD staff covering housing, land use and zoning, urban design, transportation, open space, institutional uses, and economic development.
Propagate and Populate: Plant Swap (Central Square)
Calling all plant lovers! Add some green into your home! Bring your own plants to share propagules with others or come to pot a new plant baby for your home collection.
We'll have a small collection of house plant propagules, along with soil and plastic planting containers. Attendees are welcome to bring their own pots as well.
Terrain OBJ
This terrain model is useful as a visual reference for the terrain surface as it relates to buildings, roads and sidewalks. It can be used as a setting and an initial condition for detailed design studies.
Internet Basics: Job Searching (Central)
Learn how to use web browsers to conduct a job search.
To view and register for other Basic Tech Classes at the Library, please go to tinyurl.com/basictechclass.
Vacation Week: Scratch Art Tiles (Collins)
Create your own scratch art tiles. Begin with a black square and scratch a design to reveal the magical colors hidden beneath.
Recommended for children ages 6-12 and their caregivers.
Raymond Park
The City of Cambridge will renovate Raymond Park in Neighborhood Nine. The design and community engagement process will begin in early 2024, and construction is anticipated to begin in 2025.