2015 Site Monitoring Report
Highlights include: a proposed wet meadow restoration project in Weston, ongoing construction and improvements along Route 2 and 128 that will result in 5 new stormwater treatment and spill containment basins, improvements to 8 existing basins along Route 128, and the creation of vegetated swales in the Route 2 median.
Kinetic Energy Tiles
Kinetic energy tiles are tiles that generate energy from your footsteps! We want to introduce these tiles into our city and get Cambridge residents involved with clean energy! These tiles can power streetlights, phones, or laptops.
Commonwealth Elevates Cambridge and Northeast Region To Critical Drought Status
Despite the considerable snowfall that Cambridge and the greater region has had this winter, drought conditions have been elevated due to limited groundwater recharge this winter. The Secretary of the Commonwealth’s Energy and Environmental Affairs (EEA) elevated the Northeast Region of Massachusetts, which includes Cambridge, from a Level 2 - Significant Drought to a Level 3 - Critical Drought earlier this week. In response to the ongoing drought, Cambridge has implemented strict water use restrictions.
Daily Log 9.5.2022
An overview of the Cambridge Police Department's daily calls for service for September 2-5th, 2022