Terrain OBJ
This terrain model is useful as a visual reference for the terrain surface as it relates to buildings, roads and sidewalks. It can be used as a setting and an initial condition for detailed design studies.
Climate Action Plan
The Climate Action Plan describes how Cambridge will reduce emissions across the entire city to reach carbon neutrality by 2050.
Grand Junction Multi-use Path
Grand Junction Multi-use Path project is a rail with trail alongside or within the Grand Junction railroad right of way, which is now primarily owned by the state, without precluding future transit on the corridor. The first segment was constructed in 2016 as part of the Grand Junction Park. Since then, the City committed $10 million for the design and construction of the path north of Broadway, and MIT committed $8.5 million and right-of-way for the design and construction on MIT-owned portions between Main Street and Pacific Street. In 2019 the City began the design process for the multi-use path between the Charles River at the BU Bridge and the Cambridge Somerville city line.
Shaded Seats on Hot Streets
Create 3-5 shaded seating areas in busy areas most in need of shade and seating. Each area will be 300 to 500 square feet and include shade canopies and inviting places to sit: bench swings, chairs, tables, and communal seating.