Charging into the Future
Let us help Cambridge drive and ride into the future with new publicly accessible electric car, bike, and scooter charging stations. Pole-mounted stations make on-street charging a reality, benefiting those who do not have dedicated driveways.
Give me Shelter
Provide a secure and dry option for cyclists at the Cambridge Main Library by building a year-round covered bike shelter.
PB Cycle 4
The fourth Cambridge Participatory Budgeting (PB) cycle ran from May to December 2017. The City set aside $800,000 of the FY19 Budget for one-time capital PB projects to improve the community. PB Cycle 4 Timeline
Low Carbon Energy Supply Strategy 2018
The purpose of this study was to determine current and future energy demand, assess the potential for renewable energy generation in Cambridge, develop technical scenarios for renewable energy delivery systems, and evaluate the risks, benefits, and feasibility of each scenario along with discussion of potential implementation pathways.
East Cambridge Neighborhood Study
Recommendations by a 1989 study committee composed of neighborhood residents working with CDD staff covering housing, land use and zoning, urban design, transportation, open space, institutional uses, and economic development.