FY18 Annual Report
Annual Report for the City of Cambridge highlighting accomplishments for FY18 from July 1, 2017 - June 30, 2018.
By Transit
With six Red and Green Line MBTA stations, dozens of bus routes, the EZRide and Cambridgeside Mall Shuttles, getting around Cambridge on public transit is always a great option. See below for transit routes and providers.
Terrain OBJ
This terrain model is useful as a visual reference for the terrain surface as it relates to buildings, roads and sidewalks. It can be used as a setting and an initial condition for detailed design studies.
Water Fountains in Every Park
Install new water fountain/bottle-fillers at up to 9 parks that lack drinking water fixtures. If this initiative wins, funding will be complete for water fountain installation in most of the City owned parks.
Faster, Better #1 Bus for Cambridge
Increase on-time trips and reduce bus commuter transit times for the #1 Bus on Massachusetts Avenue by installing a Transit Signal Priority system at intersections allowing buses to extend green lights to get through traffic faster.
LGBTQ+ Film series
Movie: Straight Up
Todd and Rory are intellectual soul mates. He might be gay. She might not care. A romantic comedy drama with a twist; a love story without the thrill of copulation.
Renovation of Bus Shelter at Comeau Field Rindge Ave
This project entails a major redesign and renovation, with community participation, of the 83 bus shelter. New features will include acrylic panels with cut-out figures and a roof element evocative of nearby recreation and natural habitat.