Winter Ice Sampling
Photos from winter sampling on Fresh Pond in March, 2014. CWD and CFD staff carefully trekked out on the ice, which ranged from 12 - 14 inches thick. After drilling holes CWD staff measured temperature and dissolved oxygen levels vertically throughout Fresh Pond to check the ecological health of the Reservoir.
Employee Profile: Archivist Brings Cambridge’s History to Life
The Cambridge Room at the city’s main library holds a treasure trove of historical archives, and since 2010, Archivist Alyssa Pacy has worked to expand its collections to better reflect Cambridge’s diverse communities, preserving overlooked stories and making them accessible to the public. Learn more about Alyssa Pacy in this profile.
Second Street Traffic Calming
The project includes reconstruction of portions of the sidewalks, construction of new sidewalk ramps and roadway reconstruction, as well as traffic calming elements to reduce vehicle speeds and enhance safety for pedestrians.
Mid Cambridge
Map of the Mid Cambridge Neighborhood Conservation District