Monsignor O'Brien Hwy Reconstruction - Phase 1 (Third St. to Gore St.)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
Cambridge Police Department Investigating Sexual Assault in Central Square
The Cambridge Police Department is investigating a reported sexual assault that occurred on June 11, 2024. The victim told officers on scene that at approximately 12:20 a.m., on the 200 block of Franklin Street, the victim was conversing with three individuals, and does not recall what happened next. The victim reported waking up in a parking lot in Central Square and having been assaulted.
VA Health Care
Available to all veterans who were granted an other than dishonorable discharge, provided that they meet the requirements.
Conviction in Long-Unsolved Burlgary-Sex Assault of Cambridge Teen
CAMBRIDGE – Middlesex District Attorney Marian Ryan and Cambridge Police Commissioner Christine Elow announced today that Roger W. Reddick, Jr., 41, of Cambridge has pleaded guilty to three counts of Rape of a Child with Force. These charges stem from a sexual attack on a then-thirteen-year-old girl which occurred in October 2000 after the defendant, who was a stranger to the family, broke into her home.