Interactive Equity and Inclusion Dashboard
Our goal is to have a diverse and competent workforce. We actively work to achieve equal opportunity and we undertake extraordinary efforts to recruit from protected classes who historically have been excluded from the workforce--whether from institutional patterns of discrimination, disadvantage, or exclusion.
Subway
Directions to the Reservation from the Red Line.
Welcome Home Bonus
The Commonwealth of Massachusetts provides a bonus to veterans of certain designated campaigns who were domiciled in Massachusetts immediately prior to entry in the armed forces.
Apply for the Welcome Home Bonus
The Commonwealth of Massachusetts provides a bonus to veterans of certain designated campaigns who were domiciled in Massachusetts immediately prior to entry in the armed forces.
Wastewater and Stormwater Management Guidance
The Wastewater and Stormwater Management Guidance document was developed to provide guidance for construction projects and development and redevelopment projects in the City of Cambridge (City) to ensure that measures are taken throughout the project to address erosion, nonpoint source pollution, and flood control.
Monsignor O'Brien Highway Reconstruction - Phase 2A (Lechmere Canal Outfall)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
Renewable Energy
The City is on track to hit it's goal of generating 5% of the electricity it uses from onsite renewable systems.