Five Years Later, CPD Continues Search for Mitchel Iviquel
The end of March marked five years since Mitchel Iviquel was last seen by her family, but despite all the time that has passed Cambridge Police are still working to locate her. An Army Veteran who had been deployed overseas, Iviquel was thought to be unhoused in the Central Square area at the time of her disappearance.
Low Carbon Energy Supply Strategy 2018
The purpose of this study was to determine current and future energy demand, assess the potential for renewable energy generation in Cambridge, develop technical scenarios for renewable energy delivery systems, and evaluate the risks, benefits, and feasibility of each scenario along with discussion of potential implementation pathways.
Cambridgeport Blue Ribbon Committee Report
1986 report of the Blue Ribbon Committee on Cambridgeport revitalization. Focuses on land use, housing and urban design issues, with additional attention to open space, traffic and employment opportunities. Referenced in Zoning Ordinance, Article 15.12.
Preservation Grants
To aid in the preservation and rehabilitation of these older buildings, the Historical Commission administers various federal, state, and local programs.
Bridge Program
A brochure for the Community Learning Center's Bridge Program which helps students improve their skills and knowledge to be better prepared for college.
Main Street Safety Improvement Project
The City of Cambridge is moving forward with safety upgrades on Main Street, building on the foundation laid by community outreach efforts in 2023 through the Main Street Safety Improvement Project. These changes aim to enhance safety and accessibility for all road users by installing separated bike lanes, improving pedestrian crossings, and introducing measures to slow vehicle speeds.
Voter Registration Search
Search the City of Cambridge database of registered voters to verify your address, voting status (active/inactive), party affiliation and polling location.
Danehy Track and Field Construction Project
The track and field, installed in 2012, are at the end of their useful life and need to be replaced. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.