2018 Resident Survey Results
The results from this survey indicate that overall resident views of the City of Cambridge remain positive—although some key measures have reverted back to less positive 2014 levels. On perhaps the most all encompassing measure of resident sentiment, “extreme” satisfaction with overall experiences with the city
remains at the record high level for the 18-year history of this survey program.
Permitted Leaf Blower List
This is a complete list of Licensed Commercial Leaf Blowers within the City of Cambridge. Please keep in mind that you are not required to be permitted by the City unless you have two or more employees who operate leaf blowers on staff. All persons operating Leaf Blowers in the City of Cambridge, commercial or residential, must comply with the Leaf Blower Ordinance.
MassDOT Advisory: Cambridge Somerville Sidewalk Closures Along Route 28 (McGrath Highway)
The Massachusetts Department of Transportation (MassDOT) announced that daytime concrete sidewalk repairs are taking place on Route 28 (McGrath Highway) northbound between Third Street and Rufo Road. Pedestrian detours started on September 30 and will remain in place at all times for approximately three weeks. During this time, the outbound bus stop opposite Twin City Plaza will be relocated to 201 Monsignor O’Brien Highway, just south of Third Street.
Central Square City Lots Study - Virtual Community Meeting!
This will be a virtual community meeting for the study of city-owned property in Central Square. We will present draft recommendations for the future uses of the sites based on community feedback and input, as well as municipal needs.
Central Square City Lots Study: The City of Cambridge Community Development Department (CDD), in collaboration with other city departments and the Cambridge community, is leading a municipal property needs assessment and planning study for city-owned properties in Central Square.