Zoning Newsletter
Read past issues of This Month in Zoning and sign up to receive the newsletter each month
New Resident Guide
The Commission on Immigrant Rights and Citizenship (CIRC) created a New Resident Guide to serve as a resource for new arrivals in Cambridge. This overview provides information on key, Cambridge-specific providers in the service areas most commonly needed by new immigrants.
Community Safety
The Community Safety Department seeks to provide evidence-informed services that are rooted in harm reduction and trauma-informed principles and grounded in the belief that all people deserve respect, autonomy, dignity, and opportunity.
Grand Junction Multi-use Path
Grand Junction Multi-use Path project is a rail with trail alongside or within the Grand Junction railroad right of way, which is now primarily owned by the state, without precluding future transit on the corridor. The first segment was constructed in 2016 as part of the Grand Junction Park. Since then, the City committed $10 million for the design and construction of the path north of Broadway, and MIT committed $8.5 million and right-of-way for the design and construction on MIT-owned portions between Main Street and Pacific Street. In 2019 the City began the design process for the multi-use path between the Charles River at the BU Bridge and the Cambridge Somerville city line.
Sewer Cleaning and Lining
The City's contractor, National Water Main, is performing "cured-in-place" pipelining around the City. this process provides a new, jointless sewer pipe connection that minimizes root and water infiltration problems, improves flow and provides for a more structurally sound pipe without the need for excavation.
Open Studios
More than 70 artists. Sept. 9-10, 2023. Noon to 6 p.m. each day.