Partial Roadway Paving Enhancements Scheduled for October 2022
Beginning October 17th, weather permitting, the City’s contractor, E J Paving, will be performing partial roadway grinding and paving operations to enhance the road conditions on several sections of street around the City. The roadway grinding operation at each location is expected take two days followed by paving of the roadway later that same week, or the following week (weather permitting). For a list of street sections to be re-surfaced, please see below.
Economic Development Policy
Addresses challenges and opportunities offered by the economic environment of Cambridge. Expands upon these themes, analyzes recent economic trends, and enumerates existing policies and programs that grow from them.
Reservoir Hill Study
Information regarding the study of the south slope of Reservoir Hill for designation as either a neighborhood conservation district (NCD) or an extension of the Old Cambridge Historic District.