Half Crown-Marsh NCD Decennial Review Public Meeting
Notice is hereby given that the Commission will hold a Public Meeting on Monday,
March 10, 2025 at 6:00 PM to consider the following matters under Ch. 2.78, Article III of the City Code and the Order establishing the Commission. The meeting will be held online with remote participation only. The public may participate online via the Zoom platform from a phone, tablet, or computer. Register at https://tinyurl.com/HCMMar25 or call (301)715-8592. Webinar ID: 831 4593 3776
Half Crown-Marsh NCD Meeting
Notice is hereby given that the Commission will hold a Public Meeting on Monday, April 13, 2026 at 6:00 PM to consider the following matters under Ch. 2.78, Article III of the City Code and the Order establishing the Commission.
The meeting will be held online with remote participation only. The public may participate online via the Zoom platform from a phone, tablet, or computer.
Join at https://tinyurl.com/HCMApril26 or call (301) 715-8592. Webinar ID: 863 4789 1208
City of Cambridge to Advance to Phase III, Step 2 of Commonwealth's Reopening Plan on March 1, 2021, with Limited Exceptions
The City of Cambridge announced that, effective Monday, March 1, 2021, the City will advance with the Commonwealth of Massachusetts to Phase III, Step 2 of the Commonwealth’s reopening plan, with limited exceptions. An Emergency Order will be issued today by the City prohibiting live musical performances at restaurants until further notice and delaying the opening of indoor performance venues until March 22, 2021. Prior to opening, indoor performance venues will also need approval from the City of Cambridge Inspectional Services Department.
Monsignor O'Brien Hwy Reconstruction - Phase 1 (Third St. to Gore St.)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
Monsignor O'Brien Highway Reconstruction - Phase 2A (Lechmere Canal Outfall)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
Reduce and Reuse
“Reduce, Reuse, Recycle” is in order of importance. It is better to reduce than reuse; better to reuse than recycle.
Reducing and reusing prevent the environmental impact of making new items. All disposal has financial costs to the city. Recycling and composting cost the City less than trash. Still, preventing waste in the first place is best for Cambridge and the environment. It is one of the key recommendations in the Cambridge Zero Waste Master Plan.
Mission to Mars: How to Eat, Sleep and Think Like an Astronaut (Main)
Sending humans to Mars is hard. Bringing them back safely is even harder. Doing so while also having them perform cutting-edge science and exploration during the mission? A major challenge. Luckily, we can plan and test parts of our future Mars missions before we leave the ground. In this session, we discuss the design and completion of two analog (Earth-based, Mars simulation) missions: Project MADMEN and Pale Red Dot. Come experience life on Mars as we traverse rocky terrain for geology and astrobiology experiments, test different cooking methods to make Martian meals, and navigate emergencies in space.
Ever wanted to be an astronaut? This is your chance to experience life on “Mars”!
Summer Reading: Ekphrastic Poetry Workshop (Main)
Art urges us to look more closely at the world around us, and at ourselves. In this generative writing workshop, facilitated by Heather Nelson, participants will choose an image with which to “converse”: each writer will be given prompts and questions in order to interact with their image and, after having this dialogue with the art, writers will work to edit and arrange their observations into a working draft of an ekphrastic poem. There will be a little time at the end of the session for sharing drafts and discussing next steps. Registration is required.
Sherman Street Drainage Improvements
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments.