Charles Park
A passive park near the Charles River and the Cambridgeside Galleria between Cambridge Parkway and Land Boulevard near its intersection with Rogers Street. This park also includes a small tot-lot that was renovated in 2005.
Triangle Park
The City completed construction of Triangle Park, located at 200 First Street in East Cambridge, in 2023.
New Park Pavilion
Add a new pavilion to a Cambridge public park to allow for outdoor, covered gatherings during all types of weather.
Universal Design Playgrounds for Everyone
Universal Design playground equipment is designed to be usable by everyone without special adaptations or retrofitting. Let’s go beyond legally required minimum accessibility standards to ensure our playgrounds truly welcome everyone!