Timeline
A year-by-year historical narrative of Cambridge's climate and sustainability work, with supporting documents and reports.
VPPA
Through innovative collaborations, Cambridge helped fund solar and wind projects in Illinois and North Dakota, while also lowering the cost of electricity for Cambridge residents and providing them with more renewable energy.
CWDLAB
Contact the Cambridge Water Department's Laboratory
Cancelled: Fresh Pond Day 2025
Cancelled: Fresh Pond Day -- the Cambridge Water Department's annual festival-style celebration of water, community, and sustainability -- has unfortunately been cancelled due to the weather forecast.
2015 Site Monitoring Report
Highlights include: a proposed wet meadow restoration project in Weston, ongoing construction and improvements along Route 2 and 128 that will result in 5 new stormwater treatment and spill containment basins, improvements to 8 existing basins along Route 128, and the creation of vegetated swales in the Route 2 median.
Rain Gardens for Resiliency
Rain gardens are engineered to use specific soil and plants that absorb and filter stormwater, and are a cost-effective, beautiful way to naturally clean runoff and protect from flooding. Green infrastructure has never looked so good!