2015 Site Monitoring Report
Highlights include: a proposed wet meadow restoration project in Weston, ongoing construction and improvements along Route 2 and 128 that will result in 5 new stormwater treatment and spill containment basins, improvements to 8 existing basins along Route 128, and the creation of vegetated swales in the Route 2 median.
Play in the Public Realm
A summary of the many ways that parks and open space can be activated through programming and design.
Chapter 90 Contract 11
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2
Chapter 90 Contract 11
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2
Bike Repair Stations
Install 8 bike repair stations with tools and bike pumps around the City for cyclists to quickly, easily, and freely fix routine bike problems. Locations include 2 libraries, 2 T stops, 3 parks (includes Inman Sq), and Fresh Pond Parkway.