School Programs
The Historical Commission staff can make presentations in the classroom to elementary school children on a number of local history topics.
School Programs
The Historical Commission staff can make presentations in the classroom to elementary school children on a number of local history topics.
School Programs
The Historical Commission staff can make presentations in the classroom to elementary school children on a number of local history topics.
221 Mt Auburn Street
In 2023, structural deficiencies were identified in the nine-story building at 221 Mount Auburn Street, the Riverview Condominiums. During exploratory work for roof and drainage repairs, engineers discovered that the building was not built as originally designed.
To reduce the weight in the building, all residents moved out by the end of 2024. After evaluating various repair options, the Condo Association concluded that fixing the building was not feasible, and it needed to be taken down. The City worked closely with the Condo Association to review the situation and plan for demolition of the nine-story building. Demolition was completed in the spring of 2026.
2016 Artists
Page detailing the artists who participated in the Community Supported Art program in Cambridge
Brewster/Riedesel Reconstruction Project
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
History of Comprehensive Planning
From 2016 to 2019, the city undertook a process, Envision Cambridge, which resulted in a series of recommendations guiding the City to a more sustainable and equitable future by the year 2030.