Get Information About Cross Connection Control
The City of Cambridge Water Department spends millions of dollars each year to ensure the safety of our drinking water. A vital link in this effort is the Water Department's Cross-Connection Control and Backflow Prevention Programs.
35 Cherry Street Community Drop-In Hours
Swing by for updates on Just A Start's (JAS) affordable homeownership development located at 35 Cherry Street in the Port neighborhood of Cambridge. JAS and Davis Square Architects will be available to answer questions about the project.
Low Carbon Energy Supply Strategy 2018
The purpose of this study was to determine current and future energy demand, assess the potential for renewable energy generation in Cambridge, develop technical scenarios for renewable energy delivery systems, and evaluate the risks, benefits, and feasibility of each scenario along with discussion of potential implementation pathways.
Sherman Street Drainage Improvements
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments.
Listen Up Public Meeting Space Hearing Technology
Increase accessibility for people with hearing disabilities by installing technology that provides direct audio input to most hearing aid and cochlear implant users in a public meeting space such as a library or City Hall meeting room.
War Memorial Family Swim
Beginning Tuesday, September 2, the War Memorial Recreation Center (1640 Cambridge St.) will reopen for programming and public swim for the fall season. This year, we are excited to offer free Family Swim through the month of September.
Men’s Mental Health Series
Join us for a three-part series on men’s mental health! Thursdays, April 16, and 30 at 6:00 to 8:00 p.m. The sessions will be held at Elks Lodge, 55 Bishop Allen Drive in Cambridge.
Live at the Library: Words of Affirmation Sewing Workshop (Main)
Using embroidery hoops, participants will hand-stitch words of affirmation while learning basic sewing techniques. The workshop begins with a short conversation about sewing traditions across cultures, followed by guided demonstrations and hands-on practice. Recommended for ages 8+.
Municipal Broadband in Cambridge Study: Feasibility and Business Model Options March 2023
This report examines the feasibility of the City of Cambridge implementing a municipal fiber-to-the-premises (FTTP) service and finds that for the City to construct an FTTP network and establish a financially sustainable business—meaning one that covers its costs and generates a reasonable rate of return over a long period—a significant public contribution would be required. In a base-case scenario that applies conservative construction cost assumptions and reasonable revenue projections, the network could require an upfront public capital contribution of $150 million.