PFAS Information
Cambridge Water Department: Per- and Polyfluoroalkyl Substances (PFAS)
Sewer Cleaning and Lining
The City's contractor, National Water Main, is performing "cured-in-place" pipelining around the City. this process provides a new, jointless sewer pipe connection that minimizes root and water infiltration problems, improves flow and provides for a more structurally sound pipe without the need for excavation.
Watershed Map Gallery
Additional watershed land use, zoning, and water quality maps hosted on the City's Watershed Homepage
2019 Algae Monitoring Report
This report presents the 2019 results from CWD's Algae Monitoring Program, part of an on-going study to assess source water quality in Cambridge reservoirs.
2019 Benthic Macroinvertebrate Report
In 2019, CWD analyzed benthic macroinvertebrates in four tributaries in the Cambridge surface water supply watershed. These results are presented in the 2019 Benthic Macroinvertebrate Report.
Cycle to the Source
POSTPONED: Now Sunday, September 22nd! Annual bike tour of the Cambridge Watershed. CWD staff and UrbanAdventours guide residents through the drinking water supply, stopping at critical locations, such as reservoir dams.