Cambridge Garden of Peace
The Peace Garden memorial will include benches and stones or objects reflecting names of loved ones from Cambridge who lost their lives to violence. An area of Riverside Press Park will be transformed into a place of tranquility and reflection.
Importance of Water Conservation During Drought Periods
The Cambridge Water Department (CWD) carefully monitors the City’s water supply system on a weekly basis to ensure an adequate supply of water is available to meet the needs of our residents, businesses, and local organizations.
Newspaper Publication
Page containing information about the custom Common Exchange Newspaper publication and download links to each edition.
New Bin In Town
Information about the new curbside compost bin for residents
New Bin In Town
Information about the new curbside compost bin for residents
September 27 and 28 Traffic Impacts
The City of Cambridge is notifying residents, businesses, and visitors of street closures and traffic impacts September 27 and 28 due to Arts in the Park, S.S. Cosmas and Damian Society Open House, Paddy's Cambridge Classic 5K, and the Rib Festival.
Sherman Street Drainage Improvements
The Walden Square Inflow and Infiltration (I&I) Project is located in the vicinity of 99 Sherman Street. The City has designated this area for redesign to help reduce the amount of storm water that goes into the city drainage system in order to prevent flooding during heavy rain events. The I&I project at Walden Square encompasses three parcels of land with the first parcel being the surface parking lot at Danehy Park, the second being the roadway at Sherman Street, and the third being the surface lot at the Walden Square Apartments.